SCP-2052
Euclid
~
medium confidence
SCP-2052
Expected annual
$2.1M
One-time setup
$6.7M
Annual recurring
$2.1M
Personnel
12
One-time capital costs are dominated by vault hardening, impact-catcher engineering, and large contingency reserves; recurring costs are dominated by staff wages (security + scientific) and overhead. Estimated capital expenditure is several million while annual operations are on the order of low-single millions.
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with no major incidents: routine operations, scheduled experiments and maintenance only.
routine experiments
scheduled maintenance
no containment incidents
🚨
Minor Incident
$2.4M/yr
Contained accidental pressurization or manipulator failure causing equipment damage or small structural repairs; limited downtime.
accidental partial exposure/pressurization
manipulator collision/failure
localized chamber repair
🚨
Major Breach
$4.6M/yr
Significant atmospheric exposure or high-energy impact that damages primary chamber and vault requiring major repairs or partial rebuild.
catastrophic chamber breach
impact exceeds sacrificial barrier capacity
structural damage to vault/floor
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | 24/7 physical security staffing (six guards across three shifts) as specified; salary assumptions per analyst notes. |
| Research Scientist | 2 | Senior researchers assigned to SCP-2052 (2) as specified; salary and overhead included in staff_wages. |
| Technician | 3 | Technicians for vacuum, robotics and instrumentation maintenance (3) as specified; included in staff_wages. |
| Safety Officer / Oversight | 1 | Dedicated safety/oversight role for vacuum operations and high-risk experiments; included in staff_wages. |
Confidence Notes
Estimates are based on analyst ranges provided in the notes and typical institutional cost structures; many line items have wide ranges (especially structural hardening, contingency reserves and insurance), so totals are approximate and sensitive to chosen reinforcement and risk-tolerance levels.