SCP-2101 Euclid ~ medium confidence
SCP-2101
Expected annual
$16.7M
One-time setup
$30.7M
Annual recurring
$16.0M
Personnel
66
Initial one-time setup and indemnities are the dominant upfront costs (tens of millions). Recurring annual costs driven by diplomatic retainers, covert operations, staffing, and capital replacement total in the mid-teens of millions per year.
🏗️ One-Time Capital Costs Total: $30.7M
Diplomatic Indemnities $12.5M
[#1] One-time negotiation/grant/indemnity payments to national and provincial authorities to halt excavation funding and secure access restrictions.
Facilities $4.3M
[#4, #10, #15, #24] Secure-access hardening, HVAC/power upgrades, quarantine/screening facility build-out and warehouse/vault construction.
Replica Stockpile $3.5M
[#8] Initial strategic stockpile of high-fidelity terracotta replicas/spare heads (200 units stockpile).
Structural Emergency Reserve $3.0M
[#6] Reserved emergency remediation fund for significant engineering repairs after seismic events.
Contingency Legal Reserve $2.8M
[#29] One-time reserve for crisis legal/PR payouts, bribes or rapid litigation to suppress leaks.
Equipment $1.7M
[#5, #11, #16, #21, #22, #14] Surveillance/sensor hardware, monitoring workstation hardware, heavy-lift vehicles & cranes, cyber-tooling, archive servers, and initial access/IT setup.
Donation Interception System $1.2M
[#2] Development and legal setup of covert donation interception, shell NGOs and bank infrastructure.
Initial Research And Lab Setup $600K
[#7] Conservation laboratory capital buildout and specialized restoration equipment.
Legal Case Reserve $600K
[#20] One-time budget for occasional litigation/legal cases related to excavation disputes.
Public Relations Initial $350K
[#18] Initial disinformation/public relations campaign buildout and media assets.
Security Training And Uniforms Initial $100K
[#3] Initial training, uniforms and equipment provisioning for on-site security and QRF.
Training Program Development $100K
[#26] One-time curriculum and course development for containment protocol training.
🔄 Annual Recurring Costs Total: $16.0M/yr
Staff Wages $4.0M/yr
[#3, #7, #11, #12, #13, #16] Payroll for on-site security (~30 personnel), conservators/technicians (8–12), monitoring center analysts (6–10), research team (6–10), clinicians (2–3), and rapid-recovery crew.
Diplomatic Retainer $3.0M/yr
[#1] Ongoing retainer/reimbursements to national/provincial offices and museum authorities to maintain halted excavation and liaison.
Cover Story And Legal $2.2M/yr
[#18, #20, #23, #19] Ongoing public-relations/media buys, legal retainers and lobbying costs, artifact/liability insurance, and community/cultural diplomacy disbursements.
Covert Field Operations $1.2M/yr
[#17] Annual budget for undercover disruption, surveillance and field teams to prevent unauthorized digs/activists.
Capital Replacement Reserve $1.2M/yr
[#30] Annual set-aside to amortize lifecycle replacement for sensors, HVAC, vehicles and lab equipment.
Facilities Maintenance $950K/yr
[#10, #15, #24, #6] HVAC/power electricity & maintenance, quarantine facility operations, warehouse operations, and ongoing geotechnical monitoring.
Logistics And Transport $950K/yr
[#9, #28] Annual budget for insured transport, specialized crating, escort security for loans, and international customs/diplomatic escort costs.
Visitor Operations $550K/yr
[#27] Staffing for reduced-access tourism, guided tours, signage, and lost-revenue mitigation.
Donation Interception Ops $400K/yr
[#2] Operational costs for interception system, banking fees, and legal maintenance of shell entities.
Cyber Intel $400K/yr
[#21] Ongoing cyber-intelligence, social media monitoring, takedowns and analyst/tool subscriptions.
Research And Monitoring $300K/yr
[#12, #5] Experimental/translation budgets and ongoing sensor data monitoring/analysis.
Replica Replenishment $300K/yr
[#8] Ongoing replacement/manufacture of high-fidelity replicas and spare pieces.
Supplies And Consumables $200K/yr
[#7, #25] Conservations consumables and daily operational consumables (adhesives, consolidants, PPE, sensor replacement parts).
Training Recurring $65K/yr
[#26] Ongoing training, recertification and drills for containment protocol compliance.
Monitoring Software Subscription $50K/yr
[#11] Recurring monitoring software licences, cloud processing and alerting subscriptions.
Medical Testing $50K/yr
[#13] Medical testing, emergency care and prophylactic monitoring for exposed personnel.
Archive Backups $48K/yr
[#22] Offsite backup hosting and maintenance for secure research and operational logs.
Cost Scenarios
📊 Baseline (baseline) $16.0M/yr
90.0% probability / year
Normal year with routine operations, monitoring, staffing and cover-story activities; no major incidents.
no_incident routine_maintenance ongoing_cover_ops
🚨 Minor Incident $19.0M/yr
6.0% probability / year +$3.0M vs baseline
Localized theft/removal attempts or small-scale vandalism causing limited statue damage and requiring emergency repair/reconstruction and PR/legal response.
attempted_removal small_seismic_activity limited_statue_damage
🚨 Major Breach $41.0M/yr
1.0% probability / year +$25.0M vs baseline
Significant removal/destruction of many SCP-2101-1 instances, sustained seismic escalation, international legal crises and large-scale reconstruction/repair operations.
mass_removal sustained_seismic_events international_exposure
🚨 Political Exposure $26.0M/yr
3.0% probability / year +$10.0M vs baseline
Major diplomatic leak or political escalation forcing large indemnities, public legal battles and increased covert/compensation spending to maintain secrecy.
diplomatic_leak media_exposure government_confrontation
👥 Personnel 66 total
Role Count Notes
Security Officer / MTF Agent 30 [#3] 24/7 guarded access and quick reaction force; rotating shifts.
Conservator / Technician 10 [#7] Terracotta conservation staff (8–12 estimated).
Monitoring Analyst / Technician 8 [#11] 24/7 sensor and CCTV operations (6–10 estimated).
Research Scientist 8 [#12] Linguists, archaeologists and parapsychology researchers (6–10 estimated).
Medical Officer 3 [#13] Clinicians for mental-health/medical monitoring (2–3 estimated).
Engineer / Maintenance / Heavy-lift Crew 4 [#16] Rapid-recovery crew and equipment operators.
Administrative Staff 3 [#14] Controlled-access request processing, records and administration.
📋 Confidence Notes
Analyst notes provide detailed line items and ranges, enabling mid-point estimates, but many items are covert, politically contingent and range widely (particularly indemnities, covert ops and contingency reserves), so uncertainty remains.
← SCP-2100 ↑ All SCPs SCP-2102 →