SCP-2132
Euclid
~
medium confidence
SCP-2132
Expected annual
$3.4M
One-time setup
$6.7M
Annual recurring
$3.1M
Personnel
12
Initial containment and capability buildout is capital-intensive (land purchase, remote monitoring nodes, power, vehicles, and reserves) with one-time setup costs ~ $6.7M; ongoing operations (MTF staffing, contracted security, medevac, research, comms and maintenance) run roughly $3.1M/year, driven primarily by personnel and contracted services.
One-Time Capital Costs
Total: $6.7M
Annual Recurring Costs
Total: $3.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.1M/yr
Normal year with routine monitoring, scheduled training, and no major incidents.
routine_operations
scheduled_research
no_unexpected_breaches
🚨
Minor Incident
$3.3M/yr
Localized incident: single serious injury, limited property damage, short-term legal/PR and medical response required.
single_agent_fatality_or_injury
localized_property_damage
short_term_public_attention
🚨
Major Breach
$5.1M/yr
Significant containment escalation: multi-team emergency deployment, expanded cover operations, possible excavation/access attempts and heavy legal costs.
mass_casualties
entity_escape_or_widespread_exposure
full_scale_public_coverup
🚨
Catastrophic Breach
$13.1M/yr
Catastrophic event: large-scale public exposure or prolonged uncontrolled anomalous effect requiring national-level response and extensive reparations.
widespread_public_exposure
major_mass_casualty_event
loss_of_site_control
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#4] Rotation pool to maintain three on-site at all times (allows relief, sick leave, training). |
| Research Scientist / Signal Analyst | 4 | [#10] Full-time linguists, signal analysts, audio forensics and cryptography specialists. |
| Site Manager / Administrative Staff | 1 | [#28] Site manager and clerical/administrative support charged to containment budget. |
Confidence Notes
Analyst notes provide detailed line items and ranges, so staffing and routine costs are reasonably well constrained; major uncertainties remain around excavation depth, anomalous range expansion, and catastrophic public exposures which can multiply costs by orders of magnitude.