SCP-2161
Euclid
~
medium confidence
SCP-2161
Expected annual
$2.2M
One-time setup
$16.4M
Annual recurring
$2.1M
Personnel
16
Up-front capital to establish a secure, purpose-built containment facility with hard isolation and incineration capability is the main cost driver (~$16.4M one-time). Ongoing annual operations — security, research staff, energy and IT/cybersecurity — are expected to be roughly $2.1M/yr.
One-Time Capital Costs
Total: $16.4M
Annual Recurring Costs
Total: $2.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.1M/yr
Normal year with steady-state containment and no major incidents.
no breaches
routine operations
scheduled maintenance
🚨
Minor Incident
$2.4M/yr
Localized incident such as a small discharge, limited paper contamination or single-file digital infection requiring remediation.
small containment breach
localized fire-suppression discharge
isolated SCP-2161-2 infection event
🚨
Major Breach
$4.1M/yr
Significant containment breach requiring large-scale remediation, contracted disposal and temporary capacity expansion.
warehouse breach/spread
widespread SCP-2161-2 infection within org networks
large-scale incineration/temporary warehouses
🚨
Catastrophic Spread
$27.1M/yr
Major uncontrolled propagation to public paper streams and networks requiring national-scale remediation and prolonged operations.
external contamination of municipal paper streams
widespread digital infection across infrastructure
failure of containment and suppression systems
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#8] 24/7 on-site security staffing: ~2 guards per shift plus supervisor (7–10 staff). |
| Cybersecurity / Forensics Specialist | 2 | [#13] 1–2 full-time sysadmins/forensics specialists to manage air-gapped systems and incident response. |
| Research Scientist / Technician | 6 | [#20] Scientific research staff and technicians (estimated 4–8) for study, monitoring and experiments. |
Confidence Notes
Analyst notes are detailed with ranges for each line item, enabling a reasoned cost model; residual uncertainty remains due to choice between lease vs build, disposal-path selection, local energy/regulatory variance and the anomalous nature of SCP-2161, so confidence is medium.