SCP-2173
Euclid
~
medium confidence
SCP-2173
Expected annual
$12.9M
One-time setup
$35.8M
Annual recurring
$12.6M
Personnel
111
Upfront one-time setup is approximately $36.0M driven by property acquisition, research seed funding, and specialized equipment; recurring annual operations are approximately $12.6M/yr driven by security staffing, research funding, and maintenance.
One-Time Capital Costs
Total: $35.8M
Annual Recurring Costs
Total: $12.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$12.6M/yr
Normal year with ongoing operations, routine maintenance, and planned research activity; no major incidents.
routine_operations
scheduled_maintenance
planned_research
🚨
Minor Incident
$13.8M/yr
Localized loss/damage to probes or sensors, limited hostile action requiring replacements, emergency amnestic use and short-term contractor surge.
probe_or_sensor_loss
localized_hostile_activity
emergency_contracting
🚨
Major Breach
$22.6M/yr
Significant hostile engagement or containment breach requiring large-scale emergency response, property damage, mass relocation, and accelerated R&D/neutralization expenses.
major_hostile_escalation
mass_probe_loss
emergency_relocation
Personnel
111 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 90 | [#10] Perimeter security personnel (armed guards), 24/7 coverage (~90 personnel) (#10). |
| Research Scientist | 10 | [#19] Scientific research team (xenobiologists, chemists, etc.) (~10 FTE) (#19). |
| Operations / Command Center Operators & Sysadmins | 5 | [#6] Command & monitoring center staffing (operators, sysadmins, director) (~5 FTE) (#6). |
| Technician / Field Technician | 3 | [#4] Sensor maintenance and calibration technicians (2–3 FTE) accounted in sensor maintenance (#4). |
| UAV Operator / Pilot | 2 | [#8] UAV pilot/operators and data processing staff included in UAV operations recurring cost (#8). |
| Medical Officer | 1 | [#16] Medical staff to administer amnestics and provide follow-up care included in medical/amnestics recurring cost (#16). |
Confidence Notes
Analyst notes include line-item estimates for nearly all components, giving moderate confidence; however big uncertainties remain around property buyouts, long-term research scaling, and low-probability high-cost incidents, so a medium confidence rating is appropriate.