SCP-2213
Euclid
~
medium confidence
SCP-2213
Expected annual
$1.7M
One-time setup
$4.4M
Annual recurring
$1.7M
Personnel
17
Initial capital and spares procurement are the dominant one-time costs (cover fabrication, incineration infrastructure, robotics, site retrofit); recurring costs are dominated by dedicated security staffing, legal/cover reserves, and maintenance/monitoring. Baseline annual operating cost is roughly $1.66M/yr; catastrophic uncontrolled-production events can add millions in one-off emergency costs.
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal covered/inert state with routine maintenance, monitoring, and no unsealing events.
no_unsealing
routine_maintenance
scheduled_drills
🚨
Minor Incident
$1.7M/yr
Planned or emergency single Operation Mu-4 unseal/reseal within the year (one event).
Operation_Mu-4_execution
specialist_overtime
amnestic_administration
🚨
Uncontrolled Production
$3.2M/yr
Cover failure with rapid, uncontrolled production requiring mass emergency response and contractor incineration.
cover_structural_failure
mass_production
emergency_contractors
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 12 | [#4] Dedicated 24/7 guard coverage and on-call rapid-response team; ~12 guards including rotation/backups as in analyst notes. |
| Research Scientist | 1 | [#15] Senior researcher (monitoring, analysis, oversight). |
| Research Technician | 1 | [#15] Lab/monitoring technician to support data collection and minor tests. |
| Medical Officer | 1 | [#6, #14, #19] Medical/occupational health partial-FTE for amnestic administration and emergency response/aftercare. |
| Engineer / Maintenance | 1 | [#7, #8, #11, #21] Engineer for incinerator/robotics/UPS maintenance and parts management. |
| Site Director / Executive Staff | 1 | [#1, #16, #17, #20] Site director (oversees Operation Mu-4 access and high-level decisions; included in staffing pool and covered by background checks). |
Confidence Notes
Estimates are order-of-magnitude and based on analyst ranges; staffing and standard maintenance are well-constrained, but probabilities of unsealing and scale of uncontrolled production are uncertain, producing moderate confidence.