SCP-2245
Euclid
~
medium confidence
SCP-2245
Expected annual
$1.0M
One-time setup
$395K
Annual recurring
$988K
Personnel
17
Estimated one-time setup costs are approximately $395,000 for containment upgrades, monitoring equipment, and initial research/medical setup. Recurring annual operations are roughly $988k driven primarily by D-Class program costs, security, research staffing, contingency/reserve and administrative overhead.
One-Time Capital Costs
Total: $395K
Annual Recurring Costs
Total: $988K/yr
Cost Scenarios
📊
Baseline
(baseline)
$988K/yr
Normal year with routine operations, no major incidents or breaches.
routine_operations
scheduled_research
no_incidents
🚨
Minor Incident
$1.1M/yr
Localized incident such as equipment failure, a non-fatal medical emergency for a subject, or small containment breach requiring investigation and temporary lockdown.
equipment_failure
medical_emergency
localized_containment_response
🚨
Major Breach
$2.5M/yr
Significant containment breach or fatality requiring large-scale response, site lockdown, extended investigations, legal action and heavy remediation.
fatality
major_equipment_loss
legal_exposure
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / PI | 1 | [#6] Part-time PI oversight allocation for experiments and protocol approval. |
| Research Technician | 1 | [#6] Dedicated full-time technician for day-to-day experiments and monitoring. |
| Security Officer / MTF Agent | 3 | [#9] Overnight dedicated guard coverage (2–3 FTEs) to cover nightly operations and rotation. |
| Veterinary Officer | 1 | [#7, #5] Veterinary oversight for twice-monthly inspections, baseline health workups and emergency interventions. |
| Medical Officer | 1 | [#15, #19] Medical support for neurocognitive monitoring, post-exposure care and administration of medical/amnestic countermeasures. |
| Engineer / Maintenance | 1 | [#3, #28] Facilities and equipment maintenance, HVAC and UPS upkeep and spare parts management. |
| Administrative Staff | 1 | [#26, #25] HR/procurement/accounting support and liaison for cover-story/legal coordination. |
| Class-D Personnel | 8 | [#8, #14] Rotational D-Class pool used nightly for exposure; includes housing/medical screening and administrative costs. |
Confidence Notes
Analyst-provided line-item ranges are detailed, allowing mid-range point estimates, but many costs are site-dependent (existing infrastructure, D-Class accounting, and chosen research posture). Uncertainty remains around incident probabilities and optional long-term research scaling.