SCP-2246
Safe
~
medium confidence
SCP-2246
Expected annual
$173K
One-time setup
$247K
Annual recurring
$168K
Personnel
4
One-time capital and fit-out are approximately $247,400 driven by archival HVAC/suppression, contingency funds, and initial research setup. Recurring annual costs are approximately $168,320/yr, driven primarily by research staffing, transcription/analysis, daily inspections, and weekly psychiatric sessions.
One-Time Capital Costs
Total: $247K
Annual Recurring Costs
Total: $168K/yr
Cost Scenarios
📊
Baseline
(baseline)
$168K/yr
Normal, uneventful year with routine inspections, weekly interviews, and ongoing research at planned levels.
no incidents
routine operations
scheduled research
🚨
Minor Incident
$178K/yr
Small unexpected behavior or localized damage requiring overtime, minor repairs, and temporary relocation of volumes.
localized damage
minor containment anomaly
short-term relocation
🚨
Major Breach
$268K/yr
Larger containment incident requiring extended emergency response, legal/PR action, and temporary transfer to secondary vault.
containment breach
unexpected propagation
extended remediation
🚨
Research Breakthrough Scaleup
$288K/yr
Decision to aggressively scale research (multi-month experiments, additional hires, accelerated digitization testing) after a breakthrough.
research breakthrough
decision to scale operations
controlled digitization attempt
Personnel
4 total
| Role | Count | Notes |
|---|---|---|
| Archivist/Technician | 1 | [#5] Performs daily 0.5 hr visual inspections, logging and photo documentation; cost included in staff_wages. |
| Psychiatrist / Medical Officer | 1 | [#9] Weekly psychiatric interviews and clinical oversight; cost included in staff_wages. |
| Security Officer / MTF Agent | 1 | [#9, #10] Security observer for interviews and entry operations; wages included in staff_wages. |
| Research Analyst / Contractor | 1 | [#19] Data/linguistic analyst (0.5 FTE contractor approximated as one assigned role); cost included in staff_wages. |
Confidence Notes
Analyst notes are detailed with line-item estimates, but several costs depend on Site-17 existing infrastructure and discretionary research decisions; potential for variance if digitization or large remediation is attempted.