SCP-2264
Safe
~
medium confidence
SCP-2264
Expected annual
$3.5M
One-time setup
$2.0M
Annual recurring
$3.3M
Personnel
13
Initial setup and heritage-compliant modifications are moderate (mid-six-figures); recurring costs are dominated by staffing, legal/cover arrangements, research, and a standing contingency reserve, yielding multi-million-dollar annual operating costs.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal year with ongoing operations, routine replacements, and no major incidents.
routine_operations
monthly_replacements
scheduled_research
🚨
Minor Incident
$3.7M/yr
Small-scale AWOL/eventual addiction incident or limited public-sighting requiring replacement, counseling, overtime, and modest PR payouts.
operative_addiction
AWOL_incident
localized_public_exposure
🚨
Major Breach
$4.8M/yr
Containment breach or mass-exposure event requiring emergency containment, use of contingency funds, medical response, and temporary site lockdown.
breach_of_entry
structural_failure
mass_medical_response
🚨
Political Exposure
$5.8M/yr
Governmental or public disclosure requiring extensive legal defense, large settlements, archaeological remediation, and potential decommissioning.
government_disclosure
major_media_exposure
archaeological_claims
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#4] 24/7 guard coverage with rotation and leave; payroll estimated at ~$50k/guard. |
| Specialist Operator | 4 | [#5] Trained ritual operators authorized to perform procedures; concurrent on-site staffing assumed 4 (rotating pool much larger; replacement costs accounted separately). |
| Medical Officer | 1 | [#8] Part-time on-site medic for acute response and coordination with emergency services; salary included in staff_wages. |
Confidence Notes
Analyst notes and the source provide detailed operational requirements (heritage constraints, monthly rotations, addiction risk) enabling a medium-confidence estimate, but final costs depend heavily on negotiated legal terms with UK authorities and chosen contingency sizing.