SCP-2384 Euclid ~ medium confidence
SCP-2384
Expected annual
$2.9M
One-time setup
$13.6M
Annual recurring
$2.8M
Personnel
16
Estimated one-time setup costs are approximately $13.64M driven primarily by contingency and capital equipment; baseline recurring operations are roughly $2.78M/yr driven by staffing, research, and monitoring. Deep-drilling or catastrophic remediation can add millions to hundreds of millions one-time if required.
🏗️ One-Time Capital Costs Total: $13.6M
Contingency Catastrophic $10.0M
[#23] Deliberate reserve for catastrophic large-scale mitigation (deep drilling campaigns, extensive chemical or engineering remediation).
Equipment $1.6M
[#2, #3, #4, #10, #17, #18, #19] Capital hardware: site power infrastructure (transfer switch, UPS, generator), CCTV/thermal cameras and recording/networking, subsurface sensors (installation), remote/robotic equipment, on-site incinerator or equivalent disposal capital, initial secure IT/storage hardware, and vehicle purchases.
Self Insurance Fund $1.0M
[#20] Seed self-insurance / contingency reserve for liabilities if commercial insurance is unavailable or insufficient.
Initial Research And Lab Setup $250K
[#7] BSL-2 lab build-out (HVAC, autoclave, cold storage, basic sequencing capability).
Deep Drilling Per Borehole $200K
[#8] Baseline allowance for a contractor shallow / exploratory borehole (hundreds of meters). Full km-scale drilling would be far costlier and is budgeted under contingency scenarios.
Environmental Remediation Escrow $200K
[#12] Initial escrow/fund for environmental permitting, baseline remediation or restoration obligations.
Emergency Response Reserve $200K
[#14] Initial rapid-response / emergency containment reserve (liquid funds, temp fencing, hazmat supplies).
Structural Remediation $100K
[#11] One-time small-scale structural mitigation (shoring, local grouting or retaining around facility) for near-surface undermining.
Facilities $80K
[#1] Supply and install redundant tamper-resistant 2 m electrified perimeter fencing, gates, anti-climb measures, grounding, signage, vegetation removal and gravel service strip for a modest 50–100 m radius pen.
Feeding Equipment $15K
[#6] Automated/secure feeding equipment and feeder infrastructure to deliver food safely without exposing staff.
Initial Ppe Stockpile $5K
[#15] Initial PPE stockpile, decontamination supplies and related one-time purchases.
🔄 Annual Recurring Costs Total: $2.8M/yr
Staff Wages $1.0M/yr
[#5] Round-the-clock on-site staff: caretakers, security guards across shifts, monitoring technicians and supervisory/scientist time (salaries, benefits, shift premiums, training).
Research And Monitoring $600K/yr
[#4, #7, #16] Ongoing lab consumables, sequencing, assays and a modest research program to study pathophysiology and growth control (combines lab consumables and research program budget).
Insurance And Liability $300K/yr
[#20] Professional liability, environmental liability and worker compensation premium estimates or allocations toward self-insurance.
Administrative Overhead $250K/yr
[#22] Utilities, janitorial, administrative staff, licensing and typical 15–25% overhead on operating budget.
Cover Story And Legal $100K/yr
[#13] Legal counsel, cover story maintenance, local agreements and PR/mitigation payments as needed.
Incident Response Replenish $100K/yr
[#14] Annual replenishment to the emergency response fund as used for drills or small incidents.
Subsurface Monitoring Surveys $80K/yr
[#4] Periodic GPR/electrical resistivity surveys, calibration, data analysis and staffing for continuous seismic/borehole instrumentation.
Environmental Compliance $60K/yr
[#12] Ongoing environmental monitoring, permits, reporting and compliance sampling (groundwater, soil, biota).
Robotics Maintenance $50K/yr
[#10] Maintenance, spare parts and repairs for ROVs/remote cutters and robotic inspection gear.
Logistics And Transport $40K/yr
[#19] Vehicles fuel/maintenance, occasional heavy-rental day rates and transport logistics for personnel/equipment.
Geotechnical Monitoring $30K/yr
[#11] Regular geotechnical assessments and monitoring to detect undermining and ground stability issues.
Training And Drills $30K/yr
[#21] Regular staff training, tabletop and full-scale emergency drills, protocol maintenance.
Facilities Maintenance $25K/yr
[#1] Ongoing physical maintenance of fencing, gates, site grounds and small civil repairs.
Supplies And Consumables $20K/yr
[#6, #15, #17] Feed, veterinary consumables, PPE replenishment, routine medical supplies and small operational consumables.
Subsurface Removal Operations $20K/yr
[#9] Routine shallow pruning/excavation operations to keep growth manageable (per-operation costs aggregated annually).
Health And Safety $20K/yr
[#15] Occupational health screening, vaccinations, medical surveillance and worker safety programs.
It And Data Services $20K/yr
[#18] Secure server maintenance, backups, secure communications and IT security services.
Power And Generator Fuel $15K/yr
[#2] Diesel fuel, generator maintenance and UPS maintenance for continuous power systems.
Surveillance Maintenance $10K/yr
[#3] Camera maintenance, cloud storage, recorder upkeep and comms link costs.
Waste Treatment And Disposal $10K/yr
[#17] Off-site incineration / biosecure disposal contracts for removed tissue (per-ton costs aggregated annually).
Cost Scenarios
📊 Baseline (baseline) $2.8M/yr
90.0% probability / year
Normal year with steady-state containment, routine pruning, monitoring and research; no major drilling or major incidents.
routine_pruning scheduled_research no_major_incident
🚨 Minor Incident $2.8M/yr
8.0% probability / year +$50K vs baseline
Localized containment incident or shallow structural issue requiring emergency response, temporary repairs and additional removal operations.
shallow_pruning_event temporary_fence_repair small_breach_response
🚨 Major Deep Drilling Operation $7.8M/yr
2.0% probability / year +$5.0M vs baseline
Approved deep-drilling or heavy mitigation (multi-km borehole or major extraction campaign) requiring contractor mobilization and large-scale remediation.
km-scale_drilling major_extraction_campaign rapid_unmanageable_growth
👥 Personnel 16 total
Role Count Notes
Caretakers 2 [#5] Two caretakers to feed SCP-2384 twice daily and handle daily care.
Security Officer / MTF Agent 8 [#5] Eight security personnel across shifts for 24/7 perimeter security.
Monitoring Technician 4 [#5] Four technicians to provide 24/7 monitoring of CCTV, sensors and remote instrumentation.
Research Scientist / Supervisor 2 [#5, #7, #16] Supervisory and research staff time for experiments, approval of explorations and analysis.
📋 Confidence Notes
Staffing, monitoring and near-surface operations are reasonably well-defined from the notes; large uncertainty remains around deep-drilling, catastrophic remediation and insurance exposure, so overall confidence is medium.
← SCP-2383 ↑ All SCPs SCP-2385 →