SCP-2393
Euclid
~
medium confidence
SCP-2393
Expected annual
$1.4M
One-time setup
$930K
Annual recurring
$1.3M
Personnel
14
Initial setup and containment retrofit are expected to cost roughly $930,500 one-time, driven by facility upgrades, secure IT/forensics hardware, and research tooling; ongoing annual costs are approximately $1,347,875 driven largely by personnel (research and security), secure storage/backups, and site overhead.
One-Time Capital Costs
Total: $930K
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with routine operations, scheduled maintenance, and no anomalous incidents.
routine_operations
scheduled_maintenance
🚨
Minor Incident
$1.4M/yr
Localized anomalous file behavior or limited propagative code requiring incident response, partial hardware replacement, and forensic analysis.
unexpected_self-executing_file
localized_data_corruption
temporary_network_leakage
🚨
Major Breach
$1.8M/yr
Significant anomalous propagation or destructive behavior causing data loss, multiple hardware failures, emergency quarantines and external contractor engagement.
propagative_anomalous_code
destructive_file_behavior
physical_damage_to_equipment
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Cybersecurity Specialist | 2 | [#12] Full-time security engineers for isolation, patch management, monitoring and incident response (1–2 specialists). |
| Linguist / Research Scientist | 4 | [#13] Linguists, computational linguists, annotators and graduate assistants working on SCP-2393-2 translation and analysis. |
| Security Guard / Site Security | 6 | [#17] Dedicated on-site guards or reallocation of site security for 24/7 protection (6 guards as noted). |
| Monitoring / Operations Technician | 2 | [#18] Technicians to manage camera monitoring, scheduled transfers, hardware checks and routine ops. |
Confidence Notes
Analyst notes provide detailed line-item ranges and staffing estimates, enabling a medium-confidence budget; uncertainty remains around anomalous behavior frequency/severity and decisions about how much existing Site-103 infrastructure will absorb, which affects both one-time and recurring totals.