SCP-2408
Keter
~
medium confidence
SCP-2408
Expected annual
$52.2M
One-time setup
$632.2M
Annual recurring
$49.8M
Personnel
70
One-time upfront capital of approximately $632,250,000 driven by subterranean BSL-4 construction, contingency/reserve funds, and covert infrastructure; recurring annual costs are approximately $49,800,000/yr driven by MTF staffing, covert regional influence, and BSL-4 research/operations.
One-Time Capital Costs
Total: $632.2M
Annual Recurring Costs
Total: $49.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$49.8M/yr
Normal operational year with no major incidents; routine containment, research, patrols, and covert influence continue.
routine_operations
no_breach
normal_research_tempo
🚨
Minor Incident
$54.2M/yr
Localized breach, capture or discovery that requires surge MTF deployments, extra transport, forensic work and limited PR/legal payouts.
localized_breach
capture_of_scp-2408-1
detected_leak_or_local_exposure
🚨
Major Breach
$249.8M/yr
Wide-release or Red Death pandemic/major containment failure requiring full contingency draws, mass response, and potential kinetic/regional operations.
widespread_release_of_red_death
major_containment_failure
mass_civilian_casualties
Personnel
70 total
| Role | Count | Notes |
|---|---|---|
| MTF Psi-13 (Witch Hunters) - Security / Operatives | 40 | [#6] Rotationally deployed operatives; salary/benefits included in staff_wages estimate. |
| MTF Psi-9 (Abyss Gazers) - Security / Operatives | 30 | [#7] Rotationally deployed operatives providing site security; salary/benefits included in staff_wages estimate. |
Confidence Notes
Many line items were given as analyst estimates and most recurring costs are specified; however large contingency/reserve sizing and the unpredictable nature of anomalous pandemic or major-breach events introduce material uncertainty.