SCP-2409
Safe
~
medium confidence
SCP-2409
Expected annual
$1.4M
One-time setup
$2.4M
Annual recurring
$1.3M
Personnel
13
One-time setup and contingency reserves drive most upfront cost (~$2.38M); ongoing annual costs are driven by 24/7 remote monitoring, research/maintenance of ECRG hardware, and legal/cover operations (≈$1.34M/yr).
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal year with no major incidents; routine monitoring, maintenance, research, and cover operations only.
no containment failures
routine maintenance only
🚨
Minor Incident
$1.4M/yr
Minor containment/tech failure or vandalism requiring field dispatch, short-term repairs, limited PR/legal activity.
localized ECRG malfunction
vandalism / targeted curiosity
small remediation/repair
🚨
Major Breach
$2.1M/yr
Significant containment failure or enforced remediation requiring emergency contracts, large abatement, heavy PR/legal action, possibly demolition.
containment tech collapse
regulatory discovery requiring abatement
large-scale emergency demolition/containment
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Remote Monitoring Technician / Analyst | 4 | [#6] 24/7 monitoring requires multiple shifts (3–6 FTE); estimated 4 FTE monitoring staff handling video/sensor feeds and escalation. |
| Security Officer / Guard (local patrol) | 3 | [#7] Periodic patrols/on-call guards (2–4 part-time) approximated as 3 staff for coverage and overtime. |
| Rapid-response Field Team | 4 | [#13] Small on-call remediation/recapture crew retained for breaches and urgent repairs; headcount reflects team and vehicle operators. |
| Engineer / Maintenance Specialist | 1 | [#2, #23] Technical lead for on-site repairs, power conditioning, and sensor maintenance; provides inspection support. |
| Administrative / Records & OPSEC Support | 1 | [#1, #18, #20] Single staffer handling corporate cover maintenance, FOIA/records responses, and liaison for OPSEC/cybersecurity operations. |
Confidence Notes
Analyst notes provide detailed line items and ranges for NYC operations, so category-level assignments are well-supported; large ranges on many items (contingency, specialist conservators, abatement) and uncertainty about long-term ECRG needs limit confidence to medium.