SCP-2434
Euclid
~
medium confidence
SCP-2434
Expected annual
$3.9M
One-time setup
$3.6M
Annual recurring
$3.6M
Personnel
35
Estimated one-time capital costs are approximately $3.63M driven primarily by containment bay construction, equipment/vehicle purchase, and property acquisition; recurring annual costs are approximately $3.59M/yr driven by staff wages (security, MTF, research), MTF readiness, and ongoing monitoring/maintenance.
One-Time Capital Costs
Total: $3.6M
Annual Recurring Costs
Total: $3.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.6M/yr
Normal operational year with no major incidents; recurring costs only.
regular_monthly_maintenance
routine_research
no_major_recoveries_or_breaches
🚨
Minor Incident
$3.6M/yr
One localized recovery/incident requiring towing, limited cleanup, per-incident MTF operations, some forensic tests and amnestic treatments.
single_recovery
local_cleanup
limited_forensics
🚨
Major Breach
$8.6M/yr
Large-scale event (e.g., cargo aircraft incident or multi-vehicle crash) requiring mass response, major cleanup, legal exposure, and high-cost recovery.
cargo_aircraft_or_multi-vehicle_crash
major_property_damage
mass_amnestics_and_MT F_mobilization
Personnel
35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#7] Nine on-site armed/cleared security guards (covers 24/7 with shifts and coverage factor). |
| MTF Agent / Detachment | 12 | [#10] 12-person rotating regional detachment (Mobile Task Force Omega-10 standing readiness). |
| Research Scientist | 3 | [#12] Senior research staff (mechanical engineer, physicist, materials scientist) for anomalous propulsion/behavior study. |
| Research Technician | 4 | [#12] Research technicians (2–4 FTEs) for experimental setup, testing, and sample processing. |
| Monitoring / Surveillance Technician | 2 | [#9] Sensor and surveillance monitoring staff (0.5–2 FTEs; rounded to 2 to ensure coverage). |
| Medical Officer | 2 | [#15] On-call medics for recovery operations and facility staff; trauma and emergency response readiness. |
| Engineer / Maintenance | 2 | [#4, #19] Maintenance and engineering staff for bay systems, lifts, grounding/safe-power gear, HVAC and utilities. |
| Administrative Staff | 1 | [#25] Project manager / administrative overhead for scheduling, audits, inventory control, and budgeting. |
Confidence Notes
Analyst notes provide detailed line-item ranges which improves confidence in cost categories, but major uncertainties remain around incident frequency, severity, and number of affected streets/properties which drive wide ranges.