SCP-2486
Euclid
~
medium confidence
SCP-2486
Expected annual
$1.2M
One-time setup
$1.4M
Annual recurring
$1.1M
Personnel
10
One-time capital costs (secure cells, test chamber, vehicle, contingency reserve) are roughly $1.42M; recurring annual operations (staffing, medical/sedation, pomegranate supply, research and transport) are about $1.13M/year, driven by security and medical/research staffing and assay/testing budgets.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal operational year with no containment incidents; routine research, maintenance, and transport.
no breaches
routine testing volume (~100 procedures/yr)
normal staffing and supply levels
🚨
Minor Incident
$1.3M/yr
Localized containment incident or equipment failure requiring overtime, repairs, temporary lockdown, and limited PR/cover operations.
minor escape or attempted breach
equipment failure (CCTV/locks)
small public exposure requiring limited cover ops
🚨
Major Breach
$2.6M/yr
Significant containment breach or high-visibility exposure requiring large-scale emergency response, extended public-misdirection, replacement capital and legal actions.
successful escape of SCP-2486-A(s)
public exposure or media attention
major facility damage or prolonged multi-site response
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#4] Minimum two armed guards per shift (2x per shift × 3 shifts = 6 guards total). |
| Security Supervisor | 1 | [#4] One supervisor FTE overseeing guard rotations and escalation. |
| Research Scientist | 2 | [#12] Two research staff/technicians for experiments, data analysis and PI support. |
| Medical Officer / Med Tech | 1 | [#5] One full-time medical tech / nurse for sedation and procedural monitoring; anesthesiologist covered by on-call retainer (not FTE). |
| Contract Anesthesiologist (on-call retainer) | 0 | [#5] Included in budget as retainer & per-procedure fees but not an FTE headcount. |
Confidence Notes
Analyst notes provide line-item estimates and reasonable mid-range assumptions for ranges, but several items have ranges and program-level choices (purchase vs lease, contingency sizing, testing intensity) which introduce uncertainty.