SCP-2513
Euclid
~
medium confidence
SCP-2513
Expected annual
$3.9M
One-time setup
$8.5M
Annual recurring
$3.9M
Personnel
33
One-time startup costs are approximately $8.53M driven primarily by land/easement acquisition, bridge stabilization/restoration, and capital for facilities/equipment; recurring annual costs are about $3.87M driven by staff wages, ongoing land-use payments, memetic/information control and legal/cover operations.
One-Time Capital Costs
Total: $8.5M
Annual Recurring Costs
Total: $3.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.9M/yr
Normal year with planned operations, no major incidents; ongoing research, monitoring, and maintenance proceed as budgeted.
no breaches
steady funding
routine research activities
🚨
Minor Incident
$4.1M/yr
Small containment incident or localized information leak requiring overtime, temporary surge staffing, legal responses and targeted PR.
localized breach or altercation
small media mention
urgent but contained restoration work
🚨
Major Breach
$5.4M/yr
Major containment breach or public exposure requiring large-scale emergency response, mass amnestics/medical response, accelerated restoration and legal settlements.
widespread disclosure
structural failure of bridge or major civil works
prolonged legal/cultural-heritage dispute
Personnel
33 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 14 | [#4] Site guards and supervisors to provide 24/7 armed presence at the bridge and perimeter patrols. |
| MTF / Rapid Response Specialists | 6 | [#5] Rotating specialized containment team for experiments, breaches and escorts (hazard pay included in staff wages). |
| Research Scientist (Archaeologist / Materials) | 4 | [#10] Core archaeology, history and materials specialists on-site or on rotation. |
| Information Control / Memetics Analyst | 6 | [#15] Monitoring social/local media, rapid takedown operations, legal coordination and memetic mitigation. |
| Administrative Staff / Project Manager | 3 | [#29] Project manager, administrative, procurement and HR support for the program. |
Confidence Notes
Estimates are grounded in line-item analyst ranges and midpoints, but legal/permitting outcomes, UNESCO/heritage interventions and the scale of required civil works introduce significant uncertainty.