SCP-2514 Euclid ~ medium confidence
SCP-2514
Expected annual
$1.9M
One-time setup
$5.6M
Annual recurring
$1.8M
Personnel
29
Initial one-time setup and contingency reserves dominate costs (~$5.6M), while ongoing personnel, security, research, and medical monitoring are the main recurring drivers (~$1.77M/yr).
🏗️ One-Time Capital Costs Total: $5.6M
Contingency Reserve $2.8M
[#20] Containment/emergency reserve for large-scale breach response, decontamination, or termination actions (single-use reserve fund).
Facilities $775K
[#1] Containment stable construction, outdoor sound barriers, fireproofing, blast-rated doors/windows, antechambers, civil/site work and access roads.
Medical Treatment Contingency $550K
[#12] Reserved fund for major long-term treatment cases arising from exposure (specialist/endocrine/surgery contingency).
Equipment $505K
[#2, #3, #4, #7] Active acoustic isolation, fire-suppression hardware, automated sugar feeder, and automated non-audio monitoring/sensor suite (hardware installs).
Initial Research And Lab Setup $375K
[#14] Research lab fit-out and initial program setup for alternative sustenance/disease-vector investigations.
Legal Pr Setup $175K
[#19] Initial legal/PR/cover-story setup costs including permits and initial witness management arrangements.
Waste Capture And Disposal $100K
[#6] Containment conveyors, sealed receptacles and collection systems for pyrotechnic residue capture (one-time installation).
Security Systems One Time $100K
[#10] Fencing, alarms, ballistic/blast-rated access controls and initial perimeter security system deployment.
Veterinary Contingency Reserve $88K
[#11] Contingency/equipment for major emergency veterinary procedures (one-time equipment or initial holdback).
Analytical Chemistry Analysis $50K
[#15] Initial pyrotechnic/chemical characterization and explosives/pyro analysis contracting.
Data Security Deployment $48K
[#17] Secure, memetic-safe documentation hardware, access controls and offsite backup deployment.
Initial Recovery And Transport $30K
[#21] Initial recovery and specialized transport equipment for retrieval from public area and occasional major transfers.
Engineering Controls $25K
[#23] Custom PLC/SCADA interlocks and fail-safe integration development and commissioning (one-time).
D Class Training $16K
[#9] One-time training costs for a rotating pool (~6–8) of D-Class equine-care personnel.
Permits And Licensing $15K
[#22] One-time legal/setup fees for pyrotechnics permitting, regulatory compliance setup and animal-welfare paperwork.
Ppe Program Initial $10K
[#8] Initial procurement and dispenser installation for 40 NRR hearing protection, FR clothing, and PPE fit-testing equipment.
Sealed Collection Refrigeration $5K
[#16] Sealed organic-waste collection and refrigeration equipment for cake/lemonade output.
🔄 Annual Recurring Costs Total: $1.8M/yr
Staff Wages $990K/yr
[#9, #10] Ongoing wages for rotating D-Class operational overhead, on-site guards/CCTV/rapid-response, escorts and administrative security overhead.
Research And Monitoring $448K/yr
[#14, #11, #15] Recurring research staffing and assays (alternative sustenance program), routine veterinary care, and periodic analytical re-testing.
Occupational Medical Monitoring $100K/yr
[#12] Ongoing baseline physicals, metabolic panels, endocrinology follow-up and monitoring for ~10 personnel at risk.
Specialist Consultants $60K/yr
[#24] Occasional external memetics, pyrotechnics, and equine metabolic disease consultants.
Facilities Maintenance $56K/yr
[#1, #2, #3, #7, #23] Maintenance and calibration for acoustic isolation, fire-suppression pumps/inspections, sensor suite upkeep, engineering interlocks and general stable maintenance.
Cover Story And Legal $40K/yr
[#19] Ongoing PR/legal maintenance, witness management, and cover-story upkeep.
Psychological Services $30K/yr
[#13] Counseling, CBT, memetic inoculation training and debriefing services for exposed personnel.
Waste Disposal And Lab Analysis $18K/yr
[#6] Annual hazardous-waste contractor disposal and periodic lab analysis for pyrotechnic residues.
Supplies And Consumables $14K/yr
[#5, #16, #18] Consumable sugar feed (bulk sucrose), pest-control contracts and routine decontamination/cleaning supplies.
Data Security Audits $6K/yr
[#17] Annual audits, memetic-proof documentation maintenance and secure-storage upkeep.
Logistics And Transport $3K/yr
[#21] Minor recurring transfer costs for occasional small movements between facilities.
Ppe Program Recurring $3K/yr
[#8] Replacement and laundering/cleaning schedule for hearing protection and FR clothing, plus consumable PPE.
Permits Renewals $2K/yr
[#22] Annual renewals, compliance audits and permitting fees.
Cost Scenarios
📊 Baseline (baseline) $1.8M/yr
80.0% probability / year
Normal year with stable containment, routine maintenance and scheduled research/monitoring only.
routine_operations scheduled_research no_incidents
🚨 Minor Incident $1.9M/yr
15.0% probability / year +$150K vs baseline
Localized equipment failure or public sighting requiring cleanup, targeted medical checks, small repairs and PR response.
equipment_failure localized_pyrotechnic_leakage public_sighting
🚨 Major Breach $4.3M/yr
5.0% probability / year +$2.5M vs baseline
Containment breach with casualties, large-scale decontamination, legal action, extended medical/surgical care and possible facility repairs or replacement.
containment_breach public_exposure mass_medical_cases
👥 Personnel 29 total
Role Count Notes
Security Officer / MTF Agent 12 On-site guards and rapid-response team for 24/7 coverage; cost basis included in staff_wages [#10].
Research Scientist 3 Veterinary/research staff for alternative sustenance and assays (2–4 researchers suggested) [#14].
D-Class Personnel 7 Rotating pool of 6–8 D-Class trained for equine care, included in training and operational overhead [#9].
Medical Officer / Veterinary Staff 3 Veterinary surgeon/tech and medical officer coverage for routine and emergency care; routine vet costs in recurring estimates [#11].
Engineer / Maintenance 2 Responsible for maintenance of acoustic systems, fire suppression, sensors and interlocks; maintenance costs in facilities_maintenance [#2, #3, #7, #23].
Administrative Staff / Site Director 2 Site management, procurement, scheduling and legal/PR coordination support; costs folded into staff_wages and cover_story_and_legal [#19].
📋 Confidence Notes
Analyst notes provide detailed line-item ranges, allowing mid-range estimates; however large uncertainties remain around long-term medical liabilities, contingency drawdowns, and frequency of breaches/exposures, so confidence is medium.
← SCP-2513 ↑ All SCPs SCP-2515 →