SCP-2526
Unknown
~
medium confidence
SCP-2526
Expected annual
$4.9M
One-time setup
$7.8M
Annual recurring
$4.8M
Personnel
34
Initial one-time setup is approximately $7.82M driven by site acquisition, containment retrofit, lab buildout and robotics; annual recurring costs are approximately $4.78M/yr driven primarily by staff wages (research + security + medical) and ongoing research/monitoring.
One-Time Capital Costs
Total: $7.8M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal year with steady-state containment, routine research, and no major incidents.
routine monitoring and sterilization
scheduled research projects
🚨
Minor Incident
$5.0M/yr
Localized telekinetic event causing injuries, localized property damage, and emergency response/cleanup.
localized telekinetic projectile events
small-scale escape or contamination requiring extra cleanup
🚨
Major Breach
$8.3M/yr
Significant containment failure or public exposure requiring large-scale sterilization, demolition, legal payouts, and possible site decommissioning.
public exposure / large-scale photographic leak
rapid uncontrolled colony growth and telekinetic escalation
🚨
Political Exposure
$6.3M/yr
High-profile media or governmental exposure forcing extended legal/PR operations, buyouts, and covert financial settlements.
leaked distorted images or whistleblower
local government scrutiny or litigation
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lab Technician | 12 | [#11] Twelve FTE researchers/technicians assumed in loaded salary estimate. |
| Security Officer / MTF Agent | 15 | [#12] On-site 24/7 armed security complement (midpoint of 12–18 estimate) included in staff wages. |
| Medical Officer | 3 | [#13] Two medics plus on-call physician for emergency response and treatment of exposure symptoms. |
| Engineer / Maintenance | 2 | [#11] HVAC/maintenance technicians and facility manager roles included in staffing estimates. |
| Administrative Staff | 2 | [#11, #2] Site administrative and liaison support included in loaded personnel costs. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories, but property acquisition costs, location-dependent service rates, and long-term research needs introduce uncertainty; telekinetic unpredictability also adds variance.