SCP-2558
Safe
~
medium confidence
SCP-2558
Expected annual
$9.6M
One-time setup
$61.6M
Annual recurring
$9.3M
Personnel
6
Total one-time capital costs are approximately $61.62M driven by landfall site construction, a large crisis reserve, and procurement of manned submersible assets; long-run annual operations in a full steady-state (including weekly rescue ops and site operations) are roughly $9.285M/yr, driven by weekly rescue operations, insurance/reserve lines, and landfall-site staffing.
One-Time Capital Costs
Total: $61.6M
Annual Recurring Costs
Total: $9.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.3M/yr
Full steady-state annual operations (no major incidents) including resumed weekly rescue ops and an operating landfall site.
normal ops
weekly rescues active
site operates within expected parameters
🚨
Minor Incident
$10.3M/yr
Localized equipment failure or limited divergence requiring emergency salvage and asset replacement.
AUV/ROV loss or major failure
small-scale salvage mobilization
temporary mission escalation
🚨
Major Breach
$24.3M/yr
Divergence toward populated area, accelerated landfall, or major containment emergency requiring heavy salvage, public containment and large cover-up operations.
unexpected course deviation
imminent landfall
public exposure requiring mass response
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | [#5] Senior analyst/scientist responsible for anomaly study, data review and experiment planning (costed within staff wages). |
| AUV Pilot / Technician | 2 | [#5] Operators and technicians for unmanned submersibles and remote systems (included in staff wages estimate). |
| Security Officer / MTF Agent | 2 | [#5] Small rotating MTF/security contingent for deployments and site security (included in staff wages estimate). |
| Administrative Staff | 1 | [#5] Administrative and logistics coordinator supporting operations (included in staff wages estimate). |
Confidence Notes
Estimates are based on explicit analyst line items with provided ranges; large uncertainties remain regarding future policy choices (whether weekly rescues resume, whether resurrected persons are retained), actual water depth and local land costs, and the chosen procurement approach (purchase vs charter), so confidence is medium.