SCP-2583 Euclid ~ medium confidence
SCP-2583
Expected annual
$1.3M
One-time setup
$1.2M
Annual recurring
$1.3M
Personnel
7
Estimated initial one-time construction and fit-out of a hermetic cleanroom and specialized containment systems is about $1.17M; the largest recurring costs are personnel and research/monitoring, yielding roughly $1.27M per year.
🏗️ One-Time Capital Costs Total: $1.2M
Facilities $638K
[#1, #2, #3, #11, #16, #17, #22] Includes construction of the 4m³ hermetic steel chamber, two-stage airlock and gowning, cleanroom-grade HVAC installation, decontamination shower installs, backup power install (generator/ATS), security infrastructure hardware, and site power/grounding/faraday/fit-out upgrades. Estimates are aggregated midpoints of provided ranges.
Equipment $411K
[#4, #5, #6, #7, #8, #10, #13] Includes one-time purchase/installation of air-purification systems (electrostatic precipitators), capacitor bank/high-voltage pulse system, embedded fiber-optic imaging array, data acquisition servers and infrastructure, environmental/electrostatic sensors, initial set of BSL-4-style suits and lockers, and clean handling toolkits. Values are mid-range aggregated estimates.
Emergency Response Equipment $48K
[#18] One-time purchase of breach mitigation equipment, portable EM-disruption devices, vacuum suit spares, initial PPE caches, and emergency planning equipment and capital fund (midpoint estimate).
Initial Research And Lab Setup $40K
[#14] Purchase and bench fit-out for microscopy and micro-mechanical testing (basic bench microscopes, micro-tensile tester). High-end SEM/TEM is assumed contracted rather than purchased in baseline; this line is for on-site lab instrumentation.
Legal Initial Setup $30K
[#20] One-time legal/cover paperwork, initial permits, and costs to establish cover-story/secure leasing or black-budget setup (midpoint of 10k–50k range).
🔄 Annual Recurring Costs Total: $1.3M/yr
Staff Wages $750K/yr
[#9] Annual salaries + benefits for containment & research staff (example staffing used: 1PI, 2 research technicians/engineers, 2 containment technicians, 2 security officers with benefits/overhead ~25–35%). Aggregate is midpoint of analyst range.
Research And Monitoring $222K/yr
[#6, #7, #8, #14, #23, #25] Ongoing costs for instrument calibration and maintenance, data storage/backup/IT support, environmental/electrostatic monitoring calibration, contracted SEM/TEM/time for advanced analyses, long-term archival storage, and programmatic research budget.
Cover Story And Legal $112K/yr
[#20] Annual legal counsel, compliance costs, cover operations and discretionary black-budget concealment expenses (midpoint of wide analyst range).
Administrative Overhead $90K/yr
[#21] Administrative, accounting, HR, and insurance/reserve costs (midpoint estimate from analyst range).
Supplies And Consumables $48K/yr
[#11, #12, #13, #15, #19, #24] Consumables including decontamination chemicals, particulate stock procurement & sterile packaging, sealed handling consumables, routine research consumables, hazardous-waste disposal contracts, and spare parts/consumable reserves.
Facilities Maintenance $34K/yr
[#3, #4, #5, #16, #17] Recurring maintenance for HVAC/HEPA filter replacement, air-purification system maintenance, periodic testing/maintenance of the capacitor/pulse system, generator fuel & maintenance, and security system upkeep.
Emergency Drills $18K/yr
[#18] Annual drills, training, and readiness exercises for emergency response teams; recurring PPE replacement for caches.
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $1.3M/yr
86.0% probability / year
Normal year with steady operations, routine maintenance, and planned research activity.
routine operations scheduled calibration planned experiments
🚨 Minor Incident $1.3M/yr
8.0% probability / year +$75K vs baseline
Small containment/technical incident requiring repairs, overtime, and replacement consumables but no loss of primary containment.
localized breach/contamination event equipment failure requiring repair
🚨 Major Breach $2.0M/yr
2.0% probability / year +$750K vs baseline
Significant containment failure or catastrophic equipment damage requiring rebuild, replacement of the hermetic chamber or major systems, extended downtime and legal/PR actions.
full chamber failure major electrical/EM damage costly legal/regulatory response
🚨 Research Scaleup $1.9M/yr
4.0% probability / year +$600K vs baseline
Deliberate expansion year with accelerated experiments, additional hires, or purchase of high-end instruments (onsite SEM/advanced equipment).
programmatic scale-up onsite high-end instrument acquisition increased staffing for intense research period
👥 Personnel 7 total
Role Count Notes
Research Scientist / Principal Investigator 1 Senior scientist overseeing program (example salary basis included in staff_wages estimate).
Research Technician / Engineer 2 Instrumentation, data and experiment support (containment & sensors).
Containment Technician 2 Entry/maintenance, suit operations, decontamination procedures.
Security Officer / MTF Agent 2 On-site security staffing (salaries included in staff_wages).
📋 Confidence Notes
Analyst notes provide detailed line-item ranges and likely drivers (chamber, personnel, capacitor system); however many items (legal/cover, insurance, scale-up choices) are highly variable, so totals are mid-range estimates rather than precise.
← SCP-2582 ↑ All SCPs SCP-2584 →