SCP-2603
Euclid
~
medium confidence
SCP-2603
Expected annual
$10.3M
One-time setup
$6.3M
Annual recurring
$10.0M
Personnel
34
Estimated one-time capital costs roughly $6.35M for site acquisition, organic containment cell construction, specialized dream-entry kit and contingency reserves; recurring annual costs ~ $10.01M driven primarily by 24/7 wake-watch staffing and MTF dream-ops, plus research and diplomatic/legal support.
One-Time Capital Costs
Total: $6.3M
Annual Recurring Costs
Total: $10.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.0M/yr
Normal year with ongoing containment operations, scheduled research, weekly/periodic dream runs and no major REM-trigger containment failures.
no REM-trigger breaches
routine MTF operations
scheduled research and maintenance
🚨
Minor Incident
$11.0M/yr
Single REM slip or limited unauthorized dream penetration causing localized conversion that is quickly contained; requires overtime, temporary remediation and extra medical care.
brief REM-trigger/subject lapse
small area conversion
overtime for containment and remediation
🚨
Major Breach
$18.0M/yr
Significant failure to prevent REM-trigger or large-scale dream incursion leading to extended inorganic-to-brine conversion, major remediation, diplomatic/legal crisis and replacement/rebuild costs.
prolonged uncontrolled REM sleep
expansion of conversion beyond site
international exposure/legal action
Personnel
34 total
| Role | Count | Notes |
|---|---|---|
| Medical Officer / Watch Attendant | 8 | [#4] Night/day wake-watch attendants, med techs and psychiatrists to prevent REM and supervise subject. |
| Security Officer / MTF Agent | 18 | [#7] MTF Omicron-Rho operatives for dream incursions, detention and security; includes continuous readiness and rotations. |
| Research Scientist | 3 | [#21, #5] Researchers for dream-domain R&D, pharmacological monitoring and brine analysis coordination. |
| Engineer / Maintenance | 2 | [#11, #3] Engineers to maintain backup power, long-range fiber/cable runs, and standoff sensor systems. |
| Administrative Staff | 2 | [#17, #18] Admin, legal liaison and logistics coordination for cover operations and diplomatic interaction. |
| Site Director / Executive Staff | 1 | [#1, #20] Project lead/site director managing containment, contingency reserves and high-level coordination. |
Confidence Notes
Analyst notes provide detailed line items and ranges for most cost drivers (staffing, tech, remediation). Uncertainty remains due to anomalous behavior unpredictability (conversion extent, breach frequency) and contingency sizing, so confidence is medium.