SCP-2634
Keter
?
low confidence
SCP-2634
Expected annual
$18.3M
One-time setup
$265.1M
Annual recurring
$14.7M
Personnel
22
Initial capital expenditures are dominated by facility buildouts, large contingency reserves, and a multi-year research program; annual operating costs are driven by specialized staff wages, legal/cover operations, emergency readiness replenishment, and utilities/HPC support.
One-Time Capital Costs
Total: $265.1M
Annual Recurring Costs
Total: $14.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.7M/yr
Normal operational year with regular research, monitoring, and no major incidents.
routine_research
no_breaches
regular_staff_rotation
🚨
Minor Incident
$17.2M/yr
Isolated exposure or limited object breach requiring targeted emergency response, additional medical/amnestic treatment, and modest legal/cover action.
isolated_object_breach
limited_personnel_exposure
localized_media_leak
🚨
Major Breach
$39.7M/yr
Significant containment/testing failure or wider dissemination of anomalous items leading to large-scale remediation, extended legal actions, and major equipment replacement.
multi-object_breach
widespread_exposure
governmental_involvement
🚨
Catastrophic Breach
$264.7M/yr
Worst-case scenario requiring extensive population-level remediation, long-term quarantine/relocation, and major reality-stabilization efforts.
uncontained_mass_exposure
national_security_escalation
need_for_large-scale_remediation
Personnel
22 total
| Role | Count | Notes |
|---|---|---|
| Theoretical Physicist / Topologist | 2 | [#3] Senior specialists for higher-dimensional theory work (from analyst team composition). |
| Cognitive Scientist / Memetics Specialist | 3 | [#3] Specialists in memetics/cognitive hazard study. |
| Software Engineer / AI | 3 | [#3] AI and simulation engineers supporting modeling and analysis. |
| Experimental Technician | 3 | [#3] Laboratory technicians for experiments and equipment operation. |
| Project Manager | 1 | [#3] Program manager overseeing multidisciplinary efforts. |
| Security Officer / MTF Agent | 10 | [#4] Armed on-site guards and rapid-response personnel for the wing (representative midpoint of 8–12). |
Confidence Notes
Costs are highly uncertain due to the telepathic, higher-dimensional nature of SCP-2634, wide numeric ranges in analyst notes, per-object variability, and speculative multi-year research programs; estimates use representative midpoints but carry significant uncertainty.