SCP-2679
Euclid
~
medium confidence
SCP-2679
Expected annual
$13.7M
One-time setup
$5.3M
Annual recurring
$13.0M
Personnel
28
One-time setup costs are moderate (~$5.3M) driven by land, equipment, and facility fit-out; recurring annual costs are dominated by staffing, research/exhumation operations, contingency/failure reserves, and large-scale mitigation planning (~$13.0M/year). Major adverse events can push single-year spending into the tens of millions.
One-Time Capital Costs
Total: $5.3M
Annual Recurring Costs
Total: $13.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$13.0M/yr
Normal operational year with steady manifest rate, regular exhumations, routine research and maintenance, and no large containment escalation.
steady_manifestation_rate
routine_exhumations
no_large_incidents
🚨
Minor Incident
$14.2M/yr
Localized surge in manifestations or a short-term containment stress requiring overtime, extra exhumations, emergency countermeasure trials, and temporary contracting.
surge_in_manifestations
localized_containment_failure
emergency_field_trials
🚨
Major Breach
$38.0M/yr
Significant escalation or partial containment failure requiring purchase/evacuation of surrounding land, initiation of large-scale engineering containment, or other multi-million-dollar emergency measures.
accelerated_expansion
containment_ring_failure
community_exposure
Personnel
28 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | Primary perimeter security and patrol staff for 24/7 coverage; majority of staff_wages line item [#3]. |
| Shift Lead / Commander | 2 | Shift-level command and coordination for perimeter teams; included in staff_wages [#3]. |
| Gatehouse / Guard Support | 2 | Gatehouse personnel for access control and briefings; included in staff_wages [#3]. |
Confidence Notes
Analyst notes provide detailed line-item ranges for infrastructure, operations, and research, enabling a structured estimate; however large uncertainties remain around exhumation rates, choice of purchase vs rental, and the size/timing of contingency/failure funds, so overall confidence is medium.