SCP-2684
Safe
~
medium confidence
SCP-2684
Expected annual
$1.5M
One-time setup
$7.1M
Annual recurring
$1.4M
Personnel
12
Initial one-time setup is dominated by coastal land acquisition and facility buildout (~$7.05M total one-time), while ongoing annual expenses (security, research, maintenance, and legal/cover operations) run roughly $1.44M/year. Major cost drivers are land purchase, research/ROV capability and recurring security + legal/cover operations.
One-Time Capital Costs
Total: $7.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with routine operations: posted guards, basic scheduled testing, maintenance, and cover story upkeep.
no major storms
routine testing only
no legal crises
🚨
Minor Incident
$1.5M/yr
Localized incident such as vandalism, small containment repair, minor legal challenge or small equipment failure requiring emergency repairs and additional legal hours.
vandalism/trespass
small equipment loss
local litigation
🚨
Major Storm Damage
$2.2M/yr
Hurricane or major storm causes substantial infrastructure and equipment damage requiring rebuilding, replacement of vessels/ROV and extensive legal/cover expenditures.
major hurricane impact
coastal flooding/erosion
destruction of cameras/structures
🚨
Research Escalation
$1.9M/yr
Program scales up research (regular deep testing, additional staff, vessel leasing and expanded analysis) that raises recurring operational costs significantly.
new research initiative
successful mapping leads to expanded program
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#9] Full-time rotating guards to ensure two posted at all times (6–8 FTEs estimated; 8 used here). |
| Site Supervisor / Security Supervisor | 1 | [#9] One shift supervisor to manage rotations and on-call response. |
| Research Scientist | 3 | [#17] Small dedicated research team (2–3 FTEs estimated) for testing, analysis and coordination with contractors. |
Confidence Notes
Estimates are based on analyst-provided ranges and reasonable mid-point selections for coastal Florida; land costs and storm exposure introduce significant variance, while other operational costs are better defined.