SCP-2688
Euclid
~
medium confidence
SCP-2688
Expected annual
$4.5M
One-time setup
$12.6M
Annual recurring
$4.5M
Personnel
37
One-time setup capital is approximately $12.6M driven by base construction, power/utility independence, maritime/transport assets and reserved escalation funds; annual operating costs are roughly $4.47M, driven primarily by staffing, village support, fuel/transport and replacement/insurance reserves.
One-Time Capital Costs
Total: $12.6M
Annual Recurring Costs
Total: $4.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.5M/yr
Normal operating year with cooperative containment posture, leased aviation, routine maintenance and no major incidents.
cooperative population
no breaches
routine maintenance
🚨
Minor Incident
$4.7M/yr
Localized incident (e.g. small breach, medical evacuation, targeted repair or limited international attention) requiring surge response, medevac and legal/PR work.
limited breach or injury
emergency medevac
localized repairs and PR/legal costs
🚨
Major Breach
$9.5M/yr
Significant containment escalation requiring large-scale evacuation, international legal/PR response and major security/military operations.
major breach or violent conflict
forced relocation/evacuation
international exposure
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 20 | [#9] Perimeter guards, patrol teams and gate/watch officers to provide 24/7 coverage (contractor staffing). |
| Research Scientist | 6 | [#10] Anthropologists, linguists, cultural specialists, field archaeologist, conservator and data analysts (resident researchers). |
| Medical Officer / Nurse | 3 | [#11] One full-time physician, one nurse/medic and occasional visiting specialists; on-site med support and supplies. |
| Engineer / Maintenance / Logistics | 8 | [#12, #6, #7] Base manager, mechanics, comms specialist, logistics officer, drivers and support staff for operations, vehicles and maritime assets. |
Confidence Notes
Estimates are based on analyst ranges and reasonable baseline choices (leased aviation, solar-hybrid power). Significant uncertainties remain regarding Kuwaiti government cooperation, choice of aviation purchase vs lease, frequency of incidents and scope of escalation funds, so medium confidence is appropriate.