SCP-2694
Safe
~
medium confidence
SCP-2694
Expected annual
$674K
One-time setup
$487K
Annual recurring
$672K
Personnel
10.0
One-time setup approximately $486,750 covering containment retrofit, HVAC and major equipment (remote manipulator, incinerator option, surveillance). Recurring costs are about $671,650/yr driven primarily by personnel (24/7 security, caretakers, researchers) and ongoing supplies/disposal.
One-Time Capital Costs
Total: $487K
Annual Recurring Costs
Total: $672K/yr
Cost Scenarios
📊
Baseline
(baseline)
$672K/yr
Normal year with no major incidents; standard operations and scheduled maintenance.
routine maintenance
regular toy procurement
scheduled testing and training
🚨
Minor Incident
$697K/yr
Localized incident (e.g., small structural damage, minor staff exposure, temporary increase in waste/disposal/overtime).
small containment breach
unexpected aggressive behavior from certain toys
🚨
Major Breach
$872K/yr
Significant containment failure or behavioral escalation requiring emergency upgrades, additional staffing, and major remediation.
widespread structural failure
SCP begins incorporating non-toy items or expands attachment radius
Personnel
10.0 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#11] 24/7 security coverage: 2guards/shift × 3 shifts = 6 FTE. |
| Caretaker / Facilities Technician | 1.5 | [#12] Daily checks, cleaning, coordinating feed/replenishment via remote systems (1–2 FTE; mid 1.5 FTE used). |
| Research Scientist | 2 | [#13] Paranormal/animal behavior researchers conducting monitoring and experiments (2 FTE). |
| Veterinary Consultant | 0.5 | [#14] Part-time veterinary/forensic biology consultant (retainer/part-time; represented as 0.5 FTE). |
Confidence Notes
Analyst notes provide detailed line items and ranges but contain optional/variable items (e.g., optional incinerator, staffing levels, testing frequency). Mid-range estimates used; uncertainty remains in frequency of incidents and choice between contracted vs. capital solutions.