SCP-2714
Safe
~
medium confidence
SCP-2714
Expected annual
$605K
One-time setup
$528K
Annual recurring
$593K
Personnel
4.6
One-time setup approximately $527,750 driven mainly by retrofitting a biological containment cell suite and specialized equipment; recurring costs are approximately $586,250/yr driven by staff wages, bio-feedstock/monitoring, and maintenance.
One-Time Capital Costs
Total: $528K
Annual Recurring Costs
Total: $593K/yr
Cost Scenarios
📊
Baseline
(baseline)
$593K/yr
Normal uneventful year: routine containment, daily imaging, scheduled maintenance, and no breaches or approved page-20/21 tests.
routine_operations
scheduled_maintenance
🚨
Research Test
$631K/yr
An approved test opening pages 20/21 is conducted, requiring specialized chamber use, additional personnel, PPE, and sample analysis.
approved_test_opening_pages_20_21
extra_lab_analysis
🚨
Minor Incident
$686K/yr
Small containment incident or equipment failure requiring limited decon, contractor support, and overtime staffing.
small_breach
equipment_failure
🚨
Major Breach
$2.1M/yr
Significant containment failure or discovery that feedstock/pathogenicity necessitates BSL-3 upgrade and multiple new suites; major capital and operational uplift required.
BSL_upgrade_required
widespread_proliferation
Personnel
4.6 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician / Biocontainment Technician | 3 | [#8, #14] Three full-time technicians to service SCP-2714-1 cells, perform feed/monitoring, and handle day-to-day containment operations. |
| Research Scientist | 0.3 | [#14] Senior researcher oversight (0.3 FTE pro rata) for approved testing and monitoring of instances. |
| Security Officer / MTF Agent | 1 | [#7] One FTE-equivalent security coverage assigned to the safe storage area / access control; marginal costs assumed if spread across site rosters. |
| Administrative Staff | 0.1 | [#6] Part-time administrative labor for low-level supplement folders, audits, and record maintenance. |
| Conservator / Technician (daily handling) | 0.2 | [#4] Part-time conservator/technician to open pages 57/58 daily, log and image content (0.25-0.5 hr/day equivalent). |
Confidence Notes
Estimates follow analyst-provided ranges and include contingent buckets; major uncertainties remain around required BSL level (2 vs 3), whether existing Site-88 infrastructure is reusable, and frequency of approved tests or breaches, so confidence is moderate.