SCP-2735 Safe ~ medium confidence
SCP-2735
Expected annual
$2.4M
One-time setup
$3.0M
Annual recurring
$2.3M
Personnel
19
First-year capital (facility upgrades, tanks, transfer locks, gas systems, and research instrumentation) is roughly $2.96M; ongoing annual costs are dominated by staff wages, specialized consumables, maintenance, and energy at about $2.27M/yr.
🏗️ One-Time Capital Costs Total: $3.0M
Equipment $1.0M
[#2, #3, #4, #5, #6, #7, #8, #10, #12, #13, #14, #21, #22, #23, #24] Primary and secondary airtight tanks, padded small tank, sealed transfer lock, gas supply manifold (capital), aeration hardware, gas monitors, UPS/generator, CCTV, lighting, deoxygenation system, initial PPE/tools, spare-parts stock, secure sample locker, and sealed transport module.
Facilities $900K
[#1, #9, #11] Construction/hardening of containment suite and structural upgrades, plus explosion-proof electrical/HVAC capital works and methane vent/abatement infrastructure.
Incident Remediation Reserve One Time $500K
[#30] One-time contingency/reserve fund for major containment incident remediation or legal/forensic response.
Heimdall Coordination Contingency $250K
[#26] Internal contingency / coordination budget for Project Heimdall liaison and remote-sensing support (small internal allocation; mission-level retrievals not included).
Initial Research And Lab Setup $245K
[#15, #16] Anaerobic culture infrastructure (bioreactors/anaerobic chambers) and initial xenobiology instrumentation (sequencers, microscopes, imaging rigs, computing).
Legal And Setup Initial $30K
[#25] Initial legal/administrative setup, cover-story establishment and OPSEC onboarding.
Initial Sop And Training $20K
[#20] Initial SOP development and training rollout costs.
🔄 Annual Recurring Costs Total: $2.3M/yr
Staff Wages $1.6M/yr
[#17, #18, #19] Containment technicians (6), security guards (6) and scientific/support staff (xenobiologists, microbiologist, containment engineer, lab manager, compliance). Aggregate salaries + benefits.
Facilities Maintenance $160K/yr
[#9, #10, #11, #27] HVAC/electrical maintenance and certified system upkeep, emergency power fuel/maintenance, methane venting system operation, and annual facility amortization/reserve for major refurbishments.
Cover Story And Legal $120K/yr
[#25] Insurance, legal, administrative OPSEC, cover-story maintenance, personnel vetting and regulatory compliance costs.
Incident Remediation Reserve $100K/yr
[#30] Annual funded reserve to accelerate response, legal remediation and forensic cleanup in the event of incidents or exposures.
Supplies And Consumables $71K/yr
[#7, #14, #15, #21, #23, #29] Replacement aeration components, water treatment/disposal logistics, microbial media/consumables, PPE consumables, secure sample storage upkeep, and waste disposal/decontamination.
Research And Monitoring $63K/yr
[#8, #12, #16] Gas sensor calibration and replacements, video storage & monitoring operations, sequencing/analysis consumables and computing costs.
Logistics And Transport $54K/yr
[#6, #24] Gas cylinder refills/bulk deliveries and vehicle upkeep; includes small recurring reserve for emergency transport/charter availability.
Heimdall Coordination Reserve $50K/yr
[#26] Small recurring allocation for Project Heimdall coordination, monitoring and contingency; major retrievals not budgeted here.
Maintenance And Replacements $30K/yr
[#22] Redundancy spares replenishment, scheduled seal/glass/pump replacements and spare-parts inventory turnover.
Emergency Charter Fund $30K/yr
[#24] Recurring budget to cover occasional emergency airlift/charter or rapid deployment costs averaged over years.
Training And Certification $25K/yr
[#20] Recurring training, safety drills, certifications for H2 handling and anaerobic transfers.
Energy Costs $18K/yr
[#28, #13] Continuous energy for pumps, lighting, deoxygenation systems and HVAC; includes small lighting electricity for SCP-2735-4 lamp.
Cost Scenarios
📊 Baseline (baseline) $2.3M/yr
81.5% probability / year
Normal year with steady operations, scheduled maintenance, routine training, and no major breaches or emergency retrievals.
steady_operations scheduled_maintenance no_major_incident
🚨 Minor Incident $2.4M/yr
15.0% probability / year +$120K vs baseline
Small containment incident (minor glass failure or small localized leak) requiring emergency relocation to secondary tank, limited repairs, overtime and supply replacement.
localized_tank_damage emergency_relocation overtime_repairs
🚨 Major Breach $3.3M/yr
3.0% probability / year +$970K vs baseline
Significant containment breach or equipment failure (tank catastrophic damage or sustained oxygenation) causing specimen death/medical response, major tank replacement, legal remediation and extended downtime.
catastrophic_tank_failure prolonged_oxygen_exposure major_repairs_and_legal
🚨 Catastrophic Breach $7.3M/yr
0.5% probability / year +$5.0M vs baseline
Widespread public exposure, multi-specimen loss, large-scale remediation and potential involvement of external retrieval/project resources.
public_discovery multi-specimen_release major_legal_and_remediation
👥 Personnel 19 total
Role Count Notes
Containment Technician 6 [#17] Two technicians per shift × three shifts for 24/7 coverage as specified.
Security Officer / MTF Agent 6 [#18] Two guards per shift × three shifts; includes training for hazardous-atmosphere incidents.
Research Scientist 4 [#19] Xenobiologist(s), veterinarian(s) and microbiologist for ongoing study and culturing.
Engineer / Maintenance 1 [#19] Containment/maintenance engineer for pumps, gas systems and HVAC.
Lab Manager / Compliance Officer 2 [#19] Lab manager and compliance/officer roles handling protocols, documentation and regulatory adherence.
📋 Confidence Notes
Estimates are built from discrete line items provided in analyst notes; capital costs and staffing are reasonably well-defined, but operational consumables, incident probabilities, and Project Heimdall-related exposures are uncertain, so overall confidence is medium.
← SCP-2734 ↑ All SCPs SCP-2736 →