SCP-2776
Euclid
~
medium confidence
SCP-2776
Expected annual
$4.1M
One-time setup
$27.8M
Annual recurring
$3.8M
Personnel
41
Initial capital construction and specialized equipment are dominant costs (~$27.8M one-time), driven by containment construction, electromagnet and laboratory purchase, and a large breach contingency reserve; annual operations are substantial (~$3.79M/yr) led by security, research staff, and ongoing monitoring/maintenance.
One-Time Capital Costs
Total: $27.8M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with routine maintenance, staffing and monitoring; no major incidents.
normal_operations
scheduled_maintenance
🚨
Minor Incident
$4.3M/yr
Localized activation or information exposure requiring electromagnet activation, overtime, limited repairs and medical treatment.
failed_info_exposure
partial_activation
localized_damage
🚨
Major Breach
$18.8M/yr
Full activation with containment loss or large-scale facility damage requiring rebuild, decontamination, core removal and mass casualty response.
full_activation
electromagnet_failure
widespread_information_exposure
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#5] Rotating pool to maintain no fewer than four posted guards 24/7 (estimated 12–20; midline 15). |
| Tactical Response / Containment Team | 8 | [#6] On-call tactical unit (6–10 personnel) with specialized training and equipment. |
| Monitoring Staff / NOC Operators | 4 | [#12] 24/7 monitoring rotation and secure recorded retention; staffing portion of monitoring costs. |
| Research Scientist / Engineer | 6 | [#16] Materials scientists, nuclear engineers, robotics/mechatronics specialists (4–8 FTEs; midline 6). |
| Behavioral Specialist / Media Producer | 3 | [#14, #15] Psychologists and content producers who curate SCP-2776's sensory environment. |
| Medical Officer | 1 | [#28] On-call medical standby and supplies for incidents. |
| Engineer / Maintenance | 2 | [#3, #21] Technical staff for electromagnet maintenance, HVAC and facility systems. |
| Administrative Staff / Liaison | 2 | [#26] Legal/cover-story and intergovernmental liaison support staff. |
Confidence Notes
Analyst provided line-item ranges and explicit guidance allowing midline estimates; however anomaly-driven risks (activation behavior, fusion core complexity) produce uncertainty in worst-case capital and incident frequency.