SCP-2816 Safe ~ medium confidence
SCP-2816
Expected annual
$293K
One-time setup
$350K
Annual recurring
$289K
Personnel
7
Estimated one-time capital of approximately $350,100 for secure storage, cameras, transport cases, initial research setup and contingency reserves; recurring annual costs about $289,400 driven mainly by security staffing, ongoing research, monitoring/IT, and facility overhead.
🏗️ One-Time Capital Costs Total: $350K
Initial Research And Lab Setup $200K
[#11] Startup funding for a small controlled-research program (2–3 researchers), lab time, specialized instruments and supplies to characterize observation criteria and anomalous behavior.
Emergency Reserve $100K
[#14] Incident response contingency fund and rapid-deploy equipment reserve (extra cameras, crates, rapid-deploy observation kits) for unexpected proliferation events.
Transport Equipment $20K
[#7] Secure transport kits and lockable cases, shock/UV protective packaging and associated purchase of secure equipment for chain-of-custody transfers.
Equipment $10K
[#2, #4, #9] Two redundant high-reliability CCTV cameras + tamper sensors per position, UPS and short-term backup hardware, and radiological survey instruments (Geiger counters, wipe-test kits); combined hardware purchase and installation.
Art Handling And Storage Setup $8K
[#8] Archival frames, acid-free backing, UV-filtered glazing and a climate-controlled storage cabinet / small cabinet installation for paintings.
Sop Development $6K
[#17] One-time development of written procedures, SOP documentation, and initial scenario drills and training materials.
Facilities $5K
[#1] Heavy-duty locker/small vault installation, biometric/card locks, tamper seals and access control hardware and installation inside Site 28.
Ppe Initial Kit $600
[#10] Initial PPE kit (gloves, cotton museum gloves, masks, coveralls) for handling and transport.
🔄 Annual Recurring Costs Total: $289K/yr
Staff Wages $110K/yr
[#5] Dedicated security staffing (1–2 FTEs rotating shifts) for access control and escorted transport; loaded salary estimate.
Research And Monitoring $80K/yr
[#11] Ongoing research program costs (personnel, experiments, consumables) to study observation requirements, proliferation risk and psychological effects.
Logistics And Transport $25K/yr
[#7] Recurring vehicle leasing/operation, driver/escort costs and training to maintain secure transit capability.
Camera Tech Monitoring $18K/yr
[#6] Periodic integrity checks, technician time for camera/recorder maintenance, firmware/patching, and audits to verify continuous observation.
Cover Story And Legal $12K/yr
[#12] Legal retainer, records systems and PR/cover-story resources for potential artifact loan interactions or leak response.
It Security $12K/yr
[#16] Encryption, access controls, software licenses and small cybersecurity budget to protect video, logs and prevent tampering or leaks.
Facilities Maintenance $11K/yr
[#4, #8, #20] UPS and generator maintenance/fuel, climate-control energy and maintenance for storage cabinet, and facility overhead allocation for dedicated room/space.
Psychological Support $6K/yr
[#13] Counseling, critical-incident debriefs and mental-health services for staff exposed to disturbing imagery.
Continuous Recording And Storage $4K/yr
[#3] 24/7 encrypted recording, RAID redundant on-site storage, backups and IT admin specifically for video retention per camera position (retention policies, audits).
Training And Refresher $3K/yr
[#17] Annual refresher training, drills and updates to SOPs for discovery, transport and observation procedures.
Medical Monitoring $2K/yr
[#18] Baseline and annual follow-up health checks for staff handling brushes/paintings (radiation surveillance) and recordkeeping.
Supplies And Consumables $2K/yr
[#19] Minor archival consumables, framing supplies, replacement parts and small repairs to storage and mounts.
Ppe Consumables $2K/yr
[#10] Ongoing purchase of disposable PPE and replacement handling consumables.
Radiological Recalibration And Dosimetry $1K/yr
[#9] Annual recalibration, consumables and dosimeter exchanges for radiological monitoring equipment and staff dosimetry.
Secure Disposal Per Instance $1K/yr
[#15] Budgeted per-instance secure disposal/sequestration costs (secure incineration or transfer to deep storage); assumes ~1 instance/year as baseline.
Cost Scenarios
📊 Baseline (baseline) $289K/yr
92.5% probability / year
Normal uneventful year with routine monitoring, research and no proliferation incidents.
routine_operations scheduled_research no_incidents
🚨 Minor Incident $309K/yr
5.0% probability / year +$20K vs baseline
Small proliferation or a single unobserved instance requiring extra cameras, overtime, temporary disposal and modest legal/PR work.
single_proliferation temporary_overtime additional_equipment_deployed
🚨 Major Proliferation $589K/yr
0.5% probability / year +$300K vs baseline
Large-scale proliferation or rapid creation of multiple SCP-2816-1 instances requiring emergency reserve activation, sustained emergency observation teams and accelerated research.
mass_proliferation emergency_reserve_activation extended_response
🚨 Data Leak Political Exposure $364K/yr
2.0% probability / year +$75K vs baseline
Leak or public exposure of images leading to legal action, PR campaign, expanded legal costs and possible increased containment scrutiny.
unauthorized_leak media_attention legal_action
👥 Personnel 7 total
Role Count Notes
Security Officer / MTF Agent 2 [#5] Two rotating FTEs responsible for access control and escorted transport (covers staff_wages line item).
Research Scientist 2 [#11] Small research team (2 researchers) conducting characterization experiments covered by research_and_monitoring recurring and initial setup.
Technician / Maintenance 1 [#6] Camera and recording integrity technician (part-time FTE / contractor) covered by camera_tech_monitoring.
IT / Sysadmin 1 [#3, #16] Responsible for encrypted storage, backups and cybersecurity tasks covered by continuous_recording_and_storage and it_security budgets.
Administrative Staff 1 [#12, #17] Administrative support for records, chain-of-custody logs, training coordination and legal interface; costs absorbed within cover_story_and_legal and training budgets.
📋 Confidence Notes
Estimates are drawn directly from analyst ranges; per-item costs and staff counts required judgment calls (assumed midpoints, assumed 1 monitored painting position and modest instance turnover). Uncertainty remains around proliferation frequency and per-instance disposal rates, so confidence is medium.
← SCP-2815 ↑ All SCPs SCP-2817 →