SCP-2824
Safe
~
medium confidence
SCP-2824
Expected annual
$106.3M
One-time setup
$4.2B
Annual recurring
$104.3M
Personnel
41
One-time capital expenditure is approximately $3.74B driven primarily by the lunar regolith redistribution campaign and associated lunar hardware; recurring operations average about $104.3M/year driven by LOS Iota sustainment, staffing, mission ops, and sample-return logistics.
One-Time Capital Costs
Total: $4.2B
Annual Recurring Costs
Total: $104.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$104.3M/yr
Normal year with routine monitoring, scheduled inspections, periodic pruning and no major incidents or rapid-response launches.
routine_inspection_and_pruning
regular_sample_transfers (piggyback)
standard_maintenance
🚨
Minor Incident
$109.3M/yr
Non-catastrophic lunar hardware failure or accelerated local growth requiring extra sortie(s) and limited emergency repairs.
rover_or_comm_failure
extra_pruning_and_replacement_parts
localized_hardware_repair
🚨
Major Breach
$454.3M/yr
Significant unexpected behaviour (rapid growth, multiple translocations, human emergence) requiring a rapid dedicated launch/evacuation and emergency containment on Earth.
accelerated_growth_trigger
human_translocation/emergence
urgent_dedicated_return_mission
Personnel
41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 15 | [#16, #3] On-site guards and security operations staffing for Site-76 archaeological wing and LOS Iota liaison/security. |
| Research Scientist | 6 | [#14, #20, #3] Planetary scientists, archaeologists, exobiologists conducting analyses and long-term monitoring. |
| Engineer / Maintenance | 6 | [#2, #4, #6] Engineers and maintenance techs for lunar rovers, power systems, and robotic pruning hardware. |
| Mission Controller / Flight Ops | 4 | [#7, #3] Flight controllers and remote-ops staff to manage inspection/pruning sorties and rover operations. |
| Medical Officer | 2 | [#9, #11] Medical staff for quarantine, decontamination, and psychiatric evaluation/amnestic administration. |
| Conservator / Mortuary Technician | 3 | [#13] Conservators and mortuary technicians maintaining SCP-2824-2A–2E specimens at Site-76. |
| Site Director / Executive Staff | 1 | [#3, #12] Senior administrative oversight and containment approvals for LOS Iota and Site-76 operations. |
| Administrative Staff | 3 | [#12, #22] Records management, legal/cover operations, logistics coordination and accounting support. |
| Data Analyst / Systems Administrator | 1 | [#17, #5] Data storage/archival management and telemetry/video analysis support. |
Confidence Notes
Estimates are based on wide published ranges for lunar mission hardware and Foundation-specific recurring costs; major uncertainties stem from mission architecture choices (piggyback vs dedicated returns), frequency of sample returns, and unpredictability of anomalous behaviour, so figures are mid-range professional estimates.