SCP-2832
Keter
~
medium confidence
SCP-2832
Expected annual
$18.4M
One-time setup
$69.5M
Annual recurring
$17.6M
Personnel
45
One-time capital and contingency funding is large (~$69.45M) driven primarily by a multi-decade endowment and catastrophic reserves plus facility retrofit. Annual operations are dominated by staffing, sustained research, MTF readiness, and maintenance, totaling roughly $17.55M/yr.
One-Time Capital Costs
Total: $69.5M
Annual Recurring Costs
Total: $17.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$17.6M/yr
Normal operational year with no major incidents; routine activations handled by on-site teams and scheduled maintenance/research continues.
routine_activations
scheduled_maintenance
ongoing_research
🚨
Minor Incident
$19.1M/yr
Localized damaging activation or limited containment breach requiring a medium rebuild, equipment replacement, and increased medical/response costs.
unusual_activation
entity_emergence
localized_structural_failure
🚨
Major Breach
$27.6M/yr
Significant containment failure or catastrophic activation (e.g., flooding with magma, vacuum event, hostile entity emergence) causing large rebuilds, legal/PR expenses, and reserve draws.
catastrophic_activation
large_scale_structural_damage
major_casualties
Personnel
45 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 25 | [#6, #7] Permanent MTF Kappa-7 presence and rotating tactical squad personnel (personnel salaries included in staff_wages). |
| Research Scientist | 8 | [#11] Scientists dedicated to Hume-link research, prototype testing, and instrumentation R&D. |
| Technician / Monitoring Technician | 6 | [#4, #5, #18] Technicians to perform daily circumference/Hume readings, operate sensor suites, and execute instrument relocations. |
| Engineer / Maintenance | 2 | [#1, #2, #20] Structural and systems engineers for facility maintenance, ring rebuilding, and materials testing. |
| Medical Officer | 2 | [#9] On-site trauma/medical staff for immediate response and casualty care. |
| Administrative Staff | 2 | [#13, #14, #21] Admin, data management coordination, and liaison for cover/OPSEC and legal paperwork. |
Confidence Notes
Analyst notes are detailed and provide ranges, allowing a medium confidence in recurring staffing/research estimates and clear one-time items. Uncertainty remains around frequency/severity of anomalous activations, long-term discount rates for endowment sizing, and the true lifecycle costs of unknown future events.