SCP-2840
Euclid
~
medium confidence
SCP-2840
Expected annual
$1.9M
One-time setup
$840K
Annual recurring
$1.8M
Personnel
14
One-time capital/setup costs are roughly $840,000 driven by containment suite buildout, monitoring equipment, backup power and shielding; baseline recurring costs are about $1.82M/year driven primarily by security and medical staffing plus an active research program.
One-Time Capital Costs
Total: $840K
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Routine year with no major incidents; normal staffing, research, maintenance and reserves only.
no unauthorized sleep events
normal equipment uptime
standard research cadence
🚨
Minor Incident
$2.0M/yr
Localized containment event (unauthorized sleep/transfer between D-class or staff) requiring surge staffing, emergency replacement D-class and incident response operations.
unauthorized personnel sleep within 100 m
temporary equipment failure
single-host unexpected transfer
🚨
Major Breach
$6.8M/yr
Significant containment breach or unintended transfer beyond controlled population, requiring large-scale coverups, hush payments, mass quarantines and extended emergency operations.
widespread transfer beyond D-class
public exposure/leak
failure of containment suite and local spread
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#5] 24/7 guard coverage for three D-class hosts (6–8 guards recommended; midpoint used). |
| Security Supervisor | 2 | [#5] Supervisors/relief to manage shifts and enforce anti-sleep rules; salaries included in staff_wages aggregation. |
| Research Scientist / Sleep Research Lead | 1 | [#6, #20] Staff psychiatrist/sleep researcher overseeing protocols and dream reporting. |
| Research Technician / Sleep Lab Technician | 2 | [#6] Two sleep-lab technicians to manage PSG/EEG systems and overnight monitoring. |
| Nurse / Medical Officer | 1 | [#6, #13] On-site nurse/med-tech for D-class care and medication administration. |
| Administrative Staff | 1 | [#17] Administrative/oversight time for scheduling, SOP compliance and records management. |
Confidence Notes
Containment needs, staffing and equipment requirements are well-described in analyst notes allowing a reasonable estimate; uncertainty remains around decisions to purchase high-end imaging (capital) vs outsourcing, exact staffing mixes, and the magnitude/timing of confidentiality/escrow reserves and rare catastrophic escalation, so confidence is medium.