SCP-285
Euclid
?
low confidence
SCP-285
Expected annual
$1.4M
One-time setup
$1.9M
Annual recurring
$1.4M
Personnel
11
Initial capital/setup costs are approximately $1,855,000 (main drivers: containment retrofit, specialized equipment, and a $1,000,000 contingency reserve). Recurring annual costs are approximately $1,383,640 driven chiefly by staff wages, ongoing research, legal/cover-story, and maintenance.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal operational year with no major incidents; routine staffing, maintenance, research, and legal/cover-story costs only.
routine_operations
scheduled_research_and_maintenance
🚨
Minor Incident
$1.5M/yr
Localized incident such as corrupted-file forensic emergency, limited memetic exposure requiring targeted amnestics, or small structural/repair needs.
corrupted_file_recovery
localized_memetic_exposure
minor_structural_repair
🚨
Major Breach
$2.6M/yr
Significant containment failure (large mass/morphology event, thaumaturgical offensive effects, or structural failure) requiring emergency response, large repairs, decontamination, and termination options.
mass_morphology_increase
structural_failure
large_scale_decontamination
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8, #9] Six full-time guards to provide 24/7 coverage with overlap; escort overtime accounted separately. |
| Technical Staff / IT Technician | 2 | [#10] Two high-clearance technicians to manage air-gapped interface, logging, and forensics support. |
| Research Scientist | 2 | [#11, #25] Two researchers focusing on anomalous tech, memetic safety, and experiments; ongoing research funding included. |
| Medical Officer | 1 | [#12] One dedicated clinician for monitoring, psychological care, and post-exposure treatment. |
Confidence Notes
SCP-285 has highly anomalous, unpredictable morphology changes and memetic risks; many costs (frequency and severity of breaches, extent of required structural upgrades, and research outcomes) are uncertain, so estimates are approximate.