SCP-287
Safe
~
medium confidence
SCP-287
Expected annual
$967K
One-time setup
$2.4M
Annual recurring
$933K
Personnel
6
Initial one-time setup and contingency reserves dominate costs (~$2.4M one-time), while recurring annual operations (staff, ongoing research, maintenance) are moderate (~$0.93M/year), driven mainly by dedicated personnel and ongoing research/xenobiology work.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $933K/yr
Cost Scenarios
📊
Baseline
(baseline)
$933K/yr
Normal year with no major incidents; standard research and maintenance activity only.
routine_operations
scheduled_research
🚨
Minor Incident
$992K/yr
Small accidental energization or limited exposure affecting staff, requiring medical care and investigation.
accidental_current_applied
single/limited personnel exposures
🚨
Major Breach
$2.4M/yr
Significant energized event or public exposure causing mass hallucinations, large-scale emergency response and diplomatic/legal costs.
large_energization
public_exposure
mass_casualties_or_media_attention
🚨
Research Scale Up
$2.1M/yr
Decision year to pursue major research and mitigation upgrades (remote rig, Faraday facility upgrades, BSL upgrades if needed).
extended_xenobiology_program
BSL_upgrade_or_remote_rig_purchase
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (xenobiology/materials) | 1 | Primary researcher for xenometallic and biological analyses; portion of recurring research budget allocated here. [#9, #10] |
| Containment Curator / Conservator | 1 | Artifact conservator/curator responsible for storage, conservation treatments, and documentation. [#1, #4, #13] |
| Technician | 1 | Technical support for instrumentation, remote rig operation, and routine calibrations. [#6, #7, #28] |
| Security Officer / MTF Agent | 2 | On-duty security coverage for locker area and escorted transfers (two-person rule during tests). [#14] |
| Administrative Staff | 1 | Data management, logging, scheduling, and coordination with legal/archaeology teams. [#23, #21] |
Confidence Notes
Notes provide detailed line items and ranges, enabling a mid-confidence estimate; however several items (BSL retrofit, contingency reserves, breach-scale costs) have wide ranges and scenario-dependent outcomes, lowering confidence.