SCP-2877 Keter ~ medium confidence
SCP-2877
Expected annual
$12.7M
One-time setup
$35.1M
Annual recurring
$12.5M
Personnel
22
Initial capital outlay is large (≈$35.2M) driven by specialized containment infrastructure and an iridium reserve. Recurring annual costs are dominated by the monthly sphere/enclosure turnover, iridium attrition and staff/operational support (≈$12.47M/year).
🏗️ One-Time Capital Costs Total: $35.1M
Equipment $12.2M
[#2, #3, #6, #8] Capital equipment: cryogenic refrigeration system (#2), initial 1 m cobalt/iridium sphere fabrication (#3), plasma/plasma-arc incinerator capital (#6), magnetic levitation & shielding hardware (#8).
Iridium Initial Reserve $10.0M
[#10] Initial iridium procurement and secure on-site reserve (50–200 kg budgeted as capital reserve).
Contingency Reserve $5.0M
[#22] Insurance/bonding/risk contingency fund for emergency fabrication, evacuation, or accelerated purchases.
Facilities $2.0M
[#1] Hermetically sealed storage units, structural support, airlocks, and outfitting for the 67a/67b rooms.
Radiological Monitoring And Stockpile $1.5M
[#15] Radiological monitoring suite capital and emergency mitigation stockpile (alpha/gamma/neutron detectors + shielding plates).
Mobile Shielding $1.5M
[#20] Mobile iridium-coated shielding trailers and rapid-response deployable shielding kits.
Off Gas Treatment $1.0M
[#16] Capital for off-gas treatment, scrubbers, condensers and gas-recovery/cryogenic separation equipment.
Redundancy Spares $600K
[#26] Initial spare parts stockpile (cryo compressors, magnet power supplies, pumps, control electronics).
Initial Research And Lab Setup $550K
[#17, #29] Hardened remote sensor suite and initial IT/secure logging infrastructure (sensor housings, off-site backup setup, hardened control networks).
Cover Company Setup $500K
[#21] Initial setup of front companies, shell contracts and procurement obfuscation infrastructure.
Security Equipment $200K
[#18] Capital for security equipment, vehicles and hardened perimeter hardware.
Tooling Initial $50K
[#14] Special-purpose tooling, remote manipulators and sacrificial implement initial capital set.
🔄 Annual Recurring Costs Total: $12.5M/yr
Sphere Replacement $3.0M/yr
[#4] Monthly fabrication/reclamation cycle for 1 m cobalt/iridium spheres (budgeted ~$250k/month operational plan).
Staff Wages $2.3M/yr
[#18, #19, #23] Salaries and benefits for dedicated security, specialist scientists, engineers/maintenance and administrative staff.
Research And Monitoring $1.5M/yr
[#27] R&D program aimed at reducing destructive cycle and long-term containment improvements.
Iridium Attrition And Processing $1.2M/yr
[#10] Monthly attrition processing, reclamation, plating and losses from iridium use and reclamation workflows.
Enclosure Replacement $900K/yr
[#9] Monthly replacement/reclamation budget for the cobalt collapsible 4×4×2.5 m enclosure (budgeted ~$75k/month).
Ppe Consumables $600K/yr
[#11] Single-use neon-compatible protective suits and breathing apparatus consumed per monthly operation.
Cover Story And Legal $500K/yr
[#21] Ongoing legal/cover infrastructure, front company maintenance, record suppression and procurement obfuscation costs.
D Class Program $360K/yr
[#12] Recruitment, training, transport and program overhead for 3 D-Class/month under Procedure 8997-Clever.
Neon Supply $300K/yr
[#5] Bulk high-purity neon procurement and gas-handling logistics for monthly atmosphere replacement.
Energy And Utilities $200K/yr
[#7] Baseline utilities, power for refrigeration, vacuum systems and magnet control outside cryo-specific costs.
Supplies And Consumables $180K/yr
[#30] Miscellaneous consumables, calibration gases, tools/fasteners for non-exposed staff.
Tooling Replacements $180K/yr
[#14] Consumable tooling packs and sacrificial implements replaced after exposure each month.
Off Gas Operations $180K/yr
[#16] Operational costs for off-gas treatment, condensers, filtration and noble-gas recovery per month/year.
Documentation And Audit $180K/yr
[#23] Monthly documentation, auditing, inventory reconciliation and compliance reviews for Procedure 8997-Clever.
Logistics And Transport $150K/yr
[#24] Secure transport for iridium/cobalt shipments, armored neon deliveries and heavy-material logistics.
Cryogenic Operations $150K/yr
[#2] Electricity, maintenance contracts and helium/cryogen make-up for the cryogenic refrigeration system.
Facilities Maintenance $120K/yr
[#1, #7] Structural and containment maintenance, seal replacements, routine infrastructure upkeep.
Sensor Replacements $120K/yr
[#17] Replacement and maintenance of hardened, sacrificial sensors and redundant data logging hardware.
Magnetic Systems $72K/yr
[#8] Power, maintenance and quench-protection servicing for levitation and magnetic control systems.
Medical And Biohazard Handling $72K/yr
[#13] Medical screening, decontamination and biohazard pre-incineration handling per monthly operation.
Incinerator Operations $60K/yr
[#6] Energy and consumables for monthly plasma/incineration runs (per-run costs aggregated annually).
Mobile Shielding Maintenance $50K/yr
[#20] Maintenance and periodic restocking of deployable shielding trailers and rapid-response kits.
Waste Disposal $50K/yr
[#25] Hazardous waste handling and long-term disposal after treatment; regulatory avoidance costs baseline.
Training And Drills $40K/yr
[#28] Regular training, simulated runs and containment/evacuation drills.
Redundancy Restocking $30K/yr
[#26] Annual restocking for spare cryo compressors, pumps and power electronics.
Radiological Maintenance $10K/yr
[#15] Calibration, maintenance and periodic servicing for radiological monitoring equipment.
It Maintenance $10K/yr
[#29] Secure IT maintenance, off-site backup storage fees and network hardening upkeep.
Cost Scenarios
📊 Baseline (baseline) $12.5M/yr
92.5% probability / year
Normal year with scheduled monthly operations and no containment incident.
monthly sphere replacement normal iridium attrition routine operations
🚨 Minor Incident $13.0M/yr
6.0% probability / year +$500K vs baseline
Small containment anomaly or equipment failure requiring emergency repairs and increased reclamation losses.
localized equipment failure repair/reclamation surge
🚨 Major Breach $17.5M/yr
1.0% probability / year +$5.0M vs baseline
Significant containment breach or structural failure requiring replacement of major capital, large emergency purchases and extended remediation.
partial enclosure/sphere failure large iridium loss extended remediation
🚨 Catastrophic Iridium Loss $37.5M/yr
0.5% probability / year +$25.0M vs baseline
Worst-case event where iridium shielding/stock is lost or unrecoverable, forcing immediate large-scale replacement and possible temporary relocation/evacuation.
mass iridium attrition failed reclamation compound containment failures
👥 Personnel 22 total
Role Count Notes
Security Officer / MTF Agent 10 [#18] 24/7 armed response and perimeter enforcement; 8–12 guards recommended (10 budgeted).
Research Scientist / Specialist 5 [#19] Materials scientists, cryo engineers, magnetics experts, chemists and nuclear physicists (3–8 recommended).
Engineer / Maintenance 4 [#2, #8, #26] Cryo technicians, magnetics/mechanical maintenance and incinerator operators to support monthly cycles.
Administrative Staff 2 [#21, #23] Documentation, procurement obfuscation coordination and auditing staff.
Medical Officer 1 [#13] Medical screening, decontamination oversight and biohazard handling coordination.
📋 Confidence Notes
Detailed analyst notes enable a structured estimate, but large uncertainties remain around iridium market prices, reclamation efficiency and the true frequency of containment incidents; ranges for many line items are wide.