SCP-2892 Euclid ~ medium confidence
SCP-2892
Expected annual
$83.8M
One-time setup
$118.0M
Annual recurring
$81.6M
Personnel
277
One-time setup and reserve acquisition costs are roughly $118,000,000, while annual recurring operations are approximately $81,592,500; primary drivers are continuous ship and aviation operations, personnel rotations, and contingency/reserve funding.
🏗️ One-Time Capital Costs Total: $118.0M
Equipment $71.0M
[#5, #8, #11, #12, #24] Frigate acquisition/modification ($10M), airframe acquisition/modification ($25M), initial weapons stockpile ($5M), rapid-response small craft purchase ($1M), replacement/attrition reserve vessel ($30M).
Facilities $25.0M
[#1] Site construction and disguise as Indonesian naval facility (~$25M planning figure).
Initial Research And Lab Setup $11.0M
[#15, #16, #17] R&D/amnestic production setup ($3M), initial optical/satellite sensor & comms installation ($4M), ROV/AUV and underwater sensor purchase ($4M).
Decommissioning $8.0M
[#29] Decommissioning and disposal/end-of-program (~$8M planning).
Legal Incident Reserve $2.0M
[#25] One-time incident reserve for covert legal/settlement actions (~$2M).
Initial Logistics Stockpile $1.0M
[#23] Initial logistics/spares/consumables stockpile (~$1M one-time).
🔄 Annual Recurring Costs Total: $81.6M/yr
Maritime Air Operations $20.0M/yr
[#7] Continuous maritime air support non-wage operating costs (airframe maintenance, spares, flight hours) — planning split of ~$25M/yr; non-wage portion estimated ~$20M/yr.
Staff Wages $15.8M/yr
[#4, #7, #13, #22, #26] Aggregate personnel wages: frigate crew portion, maritime aircrew portion, MTF Gamma-6 rotations, local hires/contractors, watchfloor analysts (planning split of operating figures allocated to wages).
Contingency $10.6M/yr
[#28] Contingency buffer (~15% of recurring costs per analyst guidance) to cover unforeseen anomalous expenses and accelerated attrition.
Frigate Operations $9.0M/yr
[#4] Frigate operating non-wage costs (fuel/maintenance, ordnance training rounds, berthing fees) — planning split of ~$15M/yr operating; non-wage portion estimated ~$9M/yr.
Supplies And Consumables $6.3M/yr
[#10, #11, #12] Fuel and consumables for aviation and surface assets (~$5M/yr planning), munitions replenishment (~$1M/yr), small-craft maintenance/fuel (~$300k/yr).
Research And Monitoring $4.8M/yr
[#16, #17, #18] Imagery tasking & comms bandwidth (~$1M/yr), ROV/AUV maintenance & expendables (~$750k/yr), scientific research program (~$3M/yr).
Frigate Maintenance $4.0M/yr
[#6] Drydock maintenance & spare parts pool averaged (~$4M/yr planning).
Facilities Maintenance $3.8M/yr
[#2, #19] Site lease/port fees, utilities and ongoing base upkeep (~$750k/yr) plus storm-damage contingency/repairs (~$3M/yr planning).
Diplomatic Payments $2.0M/yr
[#3] Indonesian government agreement/covert payments and liaison program (~$2M/yr planning).
Logistics And Transport $1.5M/yr
[#23] Ongoing logistics, supply chain, spares replenishment and transport (~$1.5M/yr).
Cover Story And Legal $1.2M/yr
[#21, #25] Cover-story operations/AIS spoofing and deception cell (~$500k/yr) plus recurring legal/insurance/covert-liability team costs (~$750k/yr).
Air To Air Refueling $1.0M/yr
[#9] Tanker retainer (~$1M/yr planning); per-hour usage costs are additional contingency when used.
Salvage And Liability $1.0M/yr
[#20] Salvage, search-and-rescue and civilian liability baseline (~$1M/yr planning).
Medical And Evacuations $300K/yr
[#14] Boarding & interdiction medical, evacuation and temporary holding baseline (~$300k/yr planning).
Amnestic Production $200K/yr
[#15] Annual production/usage of Class B/C amnestics (~$200k/yr planning).
Environmental Compliance $150K/yr
[#27] Routine environmental monitoring & compliance (~$150k/yr planning).
Cost Scenarios
📊 Baseline (baseline) $81.6M/yr
78.0% probability / year
Normal year with continuous operations, routine maintenance, research and cover-story activities; no major incidents.
no_major_incidents routine_maintenance standard_cover_operations
🚨 Minor Incident $83.6M/yr
15.0% probability / year +$2.0M vs baseline
Localized storm damage, minor ship/airframe repair, medical evacuations and limited salvage/replacement consumables.
limited_storm_damage small_ship_attrition medical_evacuations
🚨 Major Breach $116.6M/yr
5.0% probability / year +$35.0M vs baseline
Dutchman event or hostile engagement resulting in loss/attrition of primary frigate or multiple aircraft and large salvage/legal costs.
frigate_loss multiple_asset_attrition large_salvage_operation
🚨 Political Exposure $91.6M/yr
2.0% probability / year +$10.0M vs baseline
Loss of diplomatic cover or public exposure requiring extensive covert payments, legal settlements, relocation costs and increased security.
cover_compromised diplomatic_fallout major_legal_claims
👥 Personnel 277 total
Role Count Notes
Security Officer / MTF Agent 30 [#13] MTF Gamma-6 rotational personnel for boarding, interdiction and rapid response (headcount supports continuous readiness and rotations).
Watchfloor Analyst / Duty Officer 12 [#26] 24/7 watchfloor staffing, duty officers and shift coverage.
Local Support Staff / Contractors 25 [#22] Local hires for base services, translators, plain-clothes security and contractors supporting the cover facility.
Naval Crew (frigate) 150 [#4, #6] Crew complement to support continuous frigate availability (planning wage portion allocated to staff_wages).
Aircrew / Flight Crew 60 [#7] Maritime patrol aircraft aircrew and flight support personnel (planning wage portion allocated to staff_wages).
📋 Confidence Notes
Analyst notes provide detailed planning figures for major line items (ships, aircraft, sensors, personnel) enabling a reasonable estimate; uncertainty remains due to anomalous behavior unpredictability and political/covert risk which can dramatically change recurring costs.
← SCP-2891 ↑ All SCPs SCP-2893 →