SCP-2896
Euclid
~
medium confidence
SCP-2896
Expected annual
$1.1M
One-time setup
$2.0M
Annual recurring
$1.1M
Personnel
10
Initial one-time setup is approximately $1,991,500, driven primarily by a conservation endowment, vault/retrofit work, armored transport and contingency reserves. Recurring annual costs are estimated at $1,116,500/year, driven mainly by security and research/containment staff wages and ongoing archival/vault maintenance.
One-Time Capital Costs
Total: $2.0M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with no major incidents; routine maintenance, staffing, and archival activities proceed as planned.
routine_operations
no_breach
scheduled_maintenance
🚨
Minor Incident
$1.3M/yr
Localized incident requiring emergency response, limited restoration of archival documents, overtime staffing, and short-term legal/cover expenses.
document_damage
temporary_containment_escalation
localized_equipment_failure
🚨
Major Breach
$1.9M/yr
Significant containment breach or loss/damage of archival materials requiring major restoration, potential relocation, extended legal/PR response, and accelerated research.
containment_breach
widespread_document_loss
public_exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | Two guards per shift, three shifts; salaries and benefits included in staff_wages [#8]. |
| Security Supervisor | 1 | Senior security supervisor responsible for SOPs and liaison duties; salary included in staff_wages [#9]. |
| Research Scientist | 1 | Full-time SCP researcher/lead to maintain containment documentation and coordinate archival continuity; included in staff_wages [#10]. |
| Psychiatrist | 1 | Part-time (0.5 FTE) psychiatrist for behavior management; budgeted as 0.5 FTE within staff_wages [#10]. |
| EEG Technician | 1 | Full-time/part-time EEG/monitoring technician for sleep monitoring and equipment maintenance; included in staff_wages [#10]. |
Confidence Notes
Estimates are based on analyst ranges and typical Foundation costing assumptions; many line items were provided as ranges requiring midpoint choices. The containment concept is clear but long-term temporal risks and optional research choices introduce uncertainty.