SCP-2908
Safe
?
low confidence
SCP-2908
Expected annual
$2.6M
One-time setup
$8.1M
Annual recurring
$2.5M
Personnel
10
First-year (one-time) setup approximately $8.11M driven primarily by contingency reserve, ballistic containment construction, and initial research; ongoing annual costs are roughly $2.55M driven by security staffing, contingency replenishment, monitoring, and specialized readiness.
One-Time Capital Costs
Total: $8.1M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Normal, uneventful year with no fires or public exposures — routine operations, monitoring, and maintenance only.
no firing events
no breaches
routine audits and training
🚨
Minor Incident
$2.7M/yr
Small unauthorized firing or localized containment event requiring MTF response, forensic work, and limited amnestic/PR actions.
single or few unauthorized shots
local forensic investigation
limited amnestic administration
🚨
Major Breach
$8.0M/yr
Significant firing event or containment breach that triggers large-scale emergency response, contingency spending, and possible partial use of catastrophic reserve for neutralization and global mitigation.
multiple firings causing measurable drift
widespread contamination or multi-site exposure
urgent international liaison and neutralization
🚨
Political Exposure
$3.5M/yr
Discovery or credible leak to external actors requiring heavy PR, legal, diplomatic, and covert payments to prevent public panic or scientific escalation.
external publication or leak
interagency/diplomatic escalation
legal actions or high-profile inquiries
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#5] Dedicated on-site guards providing 24/7 coverage, two-person rule, and shift redundancy (headcount derived from the staff_wages budget). |
| Security Operations / Monitoring Personnel | 2 | [#6] Site-level security ops staff to monitor alarms/cameras, coordinate with site control, and run audits (headcount derived from the staff_wages budget). |
Confidence Notes
Estimates are mid-range judgments from wide ranges in analyst notes; many costs are conditional, contingent on opaque diplomatic/legal actions, and the anomaly's physics introduces deep uncertainty, so confidence is low.