SCP-2924
Euclid
~
medium confidence
SCP-2924
Expected annual
$11.3M
One-time setup
$8.0M
Annual recurring
$10.5M
Personnel
46
Upfront capital and site build-out costs are approximately $7.95M, driven by a BSL-3 suite, containment chambers, mobile BSL-3 and vehicle purchases, plus contingency reserves. Recurring annual operations are roughly $10.49M/yr, driven primarily by security and medical/lab staff wages, MTF operational readiness, amnestic administration, and ongoing logistics.
One-Time Capital Costs
Total: $8.0M
Annual Recurring Costs
Total: $10.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$10.5M/yr
Normal year with routine outbreaks and containment activities; no major incidents or reserves drawn.
routine_recoveries
regular_bsl3_operations
scheduled_training_and_maintenance
🚨
Minor Incident
$11.2M/yr
Localized larger-than-average outbreak requiring extra field deployments, additional sequencing, overtime, and limited use of mobile lab.
cluster_outbreak
mobile_lab_deployment
increased_sequencing
🚨
Major Outbreak
$15.5M/yr
Widespread or high-severity outbreak requiring emergency reserves, large MTF mobilization, temporary field hospitals, and major PR/legal expenditures.
mass_outbreak
containment_breach_scale-up
emergency_field_hospitals
Personnel
46 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 30 | [#5] Dedicated site security staff for 24/7 coverage (30 guards accounted in staff_wages). |
| Infectious Disease Physician | 2 | [#9] On-site infectious disease physicians (2) included in medical staffing. |
| Nurse | 4 | [#9] Nursing staff for continuous monitoring and care. |
| Medical Technician / Respiratory Therapist | 4 | [#9] Technical staff supporting patient care, respiratory therapy and procedures. |
| BSL-3 Laboratory Staff | 6 | [#10] Lab technicians, microbiologists, and sequencing technicians (6) for sample processing and surveillance. |
Confidence Notes
Line items include many concrete estimates provided by the analyst notes so totals are reasonably well grounded, but outbreak frequency/scale and decisions (purchase vs lease, chamber count) introduce material uncertainty.