SCP-2933
Euclid
~
medium confidence
SCP-2933
Expected annual
$2.8M
One-time setup
$10.0M
Annual recurring
$2.7M
Personnel
19
Initial one-time capital is approximately $9.998M driven by structural stabilization, contingency reserves and major replacement contingency; ongoing annual costs are approximately $2.693M driven primarily by staffing/security, monthly sacrificial ROV missions, and monitoring/logistics.
One-Time Capital Costs
Total: $10.0M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal year with monthly missions, routine maintenance, and no major incidents.
routine monthly ROV missions
scheduled maintenance
no structural failures
🚨
Minor Incident
$2.9M/yr
Localized containment/structure incident requiring emergency repairs and contractor mobilization but no public exposure.
partial structural collapse
failed ROV recovery requiring specialized salvage
small contamination event requiring remediation
🚨
Major Breach
$9.2M/yr
Significant structural failure or contamination event requiring large-scale remediation, public mitigation and legal actions.
catastrophic containment failure
drinking-water contamination or public exposure
major excavation/replacement required
Personnel
19 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#2] 6–8 full-time guards plus 1 supervisor; estimate uses 7 guards + 1 supervisor. |
| Site Director / Executive Staff | 1 | [#13] Site manager / on-site executive staff. |
| Research Scientist | 2 | [#13] Containment/research scientists to interpret results and coordinate studies. |
| Robotics Engineer | 2 | [#13] Engineers to design, maintain and adapt ROVs and remote systems. |
| Technician | 3 | [#13] Technicians for equipment maintenance, launch/recovery operations and field support. |
| Data Analyst | 3 | [#8] 2–3 analysts responsible for secure data storage, processing and review of mission data. |
Confidence Notes
Analyst notes provide detailed line-item ranges for most cost elements enabling mid-range estimates, but uncertainty remains around long-term structural remediation, R&D payoff, and low-probability high-cost breach events.