SCP-2965 Euclid ~ medium confidence
SCP-2965
Expected annual
$14.5M
One-time setup
$21.2M
Annual recurring
$13.6M
Personnel
48
Estimated one-time capital and contingency expenses are approximately $20.175M, while recurring annual operating costs are about $13.595M; main cost drivers are permanent staffing, transit-operator compensation, R&D/monitoring, and contingency/reserve funds.
🏗️ One-Time Capital Costs Total: $21.2M
Specialized Containment Facility $8.5M
[#10] One-time build-out of an off-site hardened containment pen and short-haul transport preparation if a capture is achieved.
Contingency Reserve $6.5M
[#20] One-time reserve fund for catastrophic public-incident response, mass hospitalization, reconstruction, inquiries and reparations.
Facilities $1.7M
[#3, #4, #15] Control-room fitout (#3), reinforced egress engineering (#4), and permitting/civil-works/project management fees (#15) for working inside the transit system.
Demobilization Transfer $1.2M
[#30] One-time demobilization/transfer costs if site-management is relocated or the program is shut down (site remediation, removing infrastructure).
Equipment $1.1M
[#6, #8, #11, #22] Surveillance hardware and install (#6), mobile rapid-response vehicles (#8), specialized capture equipment procurement (#11), and communications hardware (#22).
Medical Contingency Fund $1.0M
[#13] One-time contingency fund specifically earmarked for major medical events, long-term care, indemnities referenced in the medical response note.
Initial Research And Lab Setup $625K
[#7, #9, #12] Initial data/storage processing and analyst tooling (#7), R&D initial setup and lab instruments (#9), and one-time specialized imaging/sample-prep fees (#12).
Legal And Pr Setup $250K
[#14] Initial legal/PR/liaison setup costs for cover strategy, government liaison and contract initiation.
Temporary Crowd Control Infrastructure $100K
[#5] One-time procurement of retractable barriers, rapid-deploy fences/gates, PA/stanchions designed for rapid installation/removal.
Simulation Setup $50K
[#18] One-time simulation/specialist contractor setup for regular drills and training scenarios.
Psych Ops Setup $50K
[#19] One-time production/setup costs for passenger-facing information, staged staff/actors, and cover-story materials.
🔄 Annual Recurring Costs Total: $13.6M/yr
Staff Wages $6.0M/yr
[#1] Permanent MTF staffing for 24/7 coverage (~40–60 personnel); includes wages, benefits, overtime and recruitment.
Research And Monitoring $2.3M/yr
[#7, #9, #29] Ongoing data-analyst staffing and storage (#7), operational R&D budget for restraint development/testing (#9), and long-term behavioral monitoring/analysis (#29).
Transit Operator Compensation $1.8M/yr
[#2] Annual payments/reimbursements to the local transit operator for management takeover, lost revenue, certified staff compensation and contractual labor replacement.
Facilities Maintenance $810K/yr
[#6, #10, #16, #22] Ongoing maintenance for surveillance/storage systems and racks (#6), containment-facility upkeep if built (#10), platform/station repairs per-manifestation (#16), and communications/licenses maintenance (#22).
Cover Story And Legal $500K/yr
[#14] Ongoing legal counsel, PR, government liaison, settlements and travel/diplomacy costs to manage cover story and contractual relationships.
Medical Response And Triage Fund $500K/yr
[#13] Annual operational reserve for on-site medical teams, immediate triage, hospital bills and short-term care obligations.
Public Liability Payouts $400K/yr
[#28] Annual expected goodwill payments and compensation to affected commuters/businesses to avoid leaks and legal complaints.
Supplies And Consumables $365K/yr
[#11, #24, #27] Consumables and replacement parts: capture consumables and replacement gear (#11), general consumables used in interventions (#24), and PPE/equipment replacement cycle (#27).
Insurance And Indemnity $250K/yr
[#21] Annual premiums, indemnity payments and contractual risk-transfer costs to the transit operator/vendors.
Specialist Contractor Retainers $175K/yr
[#25] Retainers for on-call structural engineers, animal behaviorists, materials scientists and HAZMAT teams.
Logistics And Transport $130K/yr
[#8, #26] Moving equipment, overnight freight, vehicle fuel/maintenance and temporary track closure logistics (#8, #26).
Psychological Operations $115K/yr
[#19] Ongoing passenger-facing messaging, content production and covert information management to minimize panic.
Veterinary Biological Services $100K/yr
[#12] Recurring veterinary/biological analysis, imaging, histology, outsourcing specialized lab work and bio-waste handling.
Training And Drills $100K/yr
[#18] Recurring cost for crowd-control personnel training, simulation contractor fees and regular drills.
Redaction And Evidence Management $50K/yr
[#23] Personnel/software/licenses for video redaction, secure archival and legal-hold for forensic evidence.
Cleaning And Biohazard Disposal $50K/yr
[#17] Regular blood/body cleanup, decontamination and regulated biohazard disposal services.
Cost Scenarios
📊 Baseline (baseline) $13.6M/yr
63.0% probability / year
Normal operating year with no major containment failures; routine manifestations handled by MTF with no large incidents or major capital projects.
regular_manifestations no_major_incident ongoing_R&D_and_maintenance
🚨 Minor Incident $15.1M/yr
30.0% probability / year +$1.5M vs baseline
A moderately severe incident (trampling/partial breach) requiring elevated medical response, cleanup, legal payouts and limited emergency repairs.
injuries requiring hospitalization localized infrastructure damage increased legal/compensation payouts
🚨 Major Breach $19.6M/yr
5.0% probability / year +$6.0M vs baseline
Containment failure or high-casualty public incident requiring mass medical response, large-scale reconstruction and protracted legal/public inquiry.
mass-casualty event public exposure major infrastructure damage
🚨 Capture And Containment Buildout $22.1M/yr
2.0% probability / year +$8.5M vs baseline
Successful capture leads to decision to build an off-site hardened containment facility in the same year, incurring large one-time capital expenditure.
successful_restraint_attempt strategic_decision_to_construct_off-site_pen
👥 Personnel 48 total
Role Count Notes
Security Officer / MTF Agent 28 [#1] Front-line containment, crowd control, armed response and station management (multi-shift staffing).
Research Scientist 4 [#1] Scientists leading R&D into restraints, conducting tests and experiments.
Medical Officer 4 [#1] On-site medics for triage and emergency care during manifestations.
Engineer / Maintenance 6 [#1] Structural, vehicle and systems maintenance for station modifications and equipment.
Administrative Staff 3 [#1] Scheduling, contractor coordination, logistics and liaison work.
Site Director / Executive Staff 1 [#1] Program leadership and liaison with higher Foundation/agency command.
Analyst / Data Reviewer 2 [#7, #29] Video/data analysts reviewing surveillance footage and maintaining behavioral logs.
📋 Confidence Notes
Estimates are built from analyst line-item ranges and a defined operating model, but many items (frequency/severity of incidents, success of R&D, local contractual terms) remain uncertain, resulting in moderate confidence.
← SCP-2964 ↑ All SCPs SCP-2966 →