SCP-2967
Euclid
~
medium confidence
SCP-2967
Expected annual
$1.2M
One-time setup
$2.3M
Annual recurring
$1.2M
Personnel
11
Initial capital outlay is approximately $2.33M driven largely by construction of the reinforced 44,000-gallon aquarium and associated room modifications and equipment; annual operating costs are about $1.19M per year, dominated by staff wages (care + security), energy, and ongoing maintenance/consumables.
One-Time Capital Costs
Total: $2.3M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal operational year with routine maintenance, staffing, feeding, and monitoring; no major incidents.
no_incident
regular_operations
🚨
Minor Incident
$1.3M/yr
Minor containment/operational incident requiring emergency veterinary care, overtime staffing, limited repairs, and increased legal/cleanup costs.
attempted_escape
temporary_power_outage
minor_structural_damage
🚨
Major Breach
$2.7M/yr
Significant containment breach or catastrophic equipment failure requiring tank reconstruction, relocation, large legal/cover settlements, and major security upgrades.
tank_failure
large_scale_escape
public_exposure
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Lead Researcher | 1 | [#8] Full-time lead responsible for behavioral/cognition research and oversight. |
| Senior Aquarist | 1 | [#8] Cephalopod-specialist aquarist responsible for husbandry and life-support oversight. |
| Aquarist / Technician | 2 | [#7, #8] Technicians providing daily care, twice-weekly transfers, enrichment handling and routine maintenance. |
| Video/Data Analyst | 1 | [#16] Analyst for reviewing behavior footage, data logging, and software management. |
| Security Officer / MTF Agent | 6 | [#9] 24/7 security coverage (two guards per shift across three shifts) to enforce two-person rule and supervise interactions. |
Confidence Notes
Analyst notes provide detailed line items for capital and operating costs, allowing a mid-range budget estimate; uncertainty remains around energy usage variability, chiller sizing/site-specific construction costs, and low-probability high-cost escalation scenarios, so confidence is medium.