SCP-3046
Safe
~
medium confidence
SCP-3046
Expected annual
$1.1M
One-time setup
$5.8M
Annual recurring
$1.1M
Personnel
13
One-time capital and contingency costs are dominated by potential relocation and technetium procurement contingencies (~$5.85M total one-time). Main recurring drivers are security and research staffing, with ongoing operations and legal/PR/amnestic reserves totaling roughly $1.13M per year.
One-Time Capital Costs
Total: $5.8M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal, uneventful year with no major incidents; routine operations, monitoring, and reserves only.
no accidental contact
no public exposure
regular maintenance and training
🚨
Minor Incident
$1.2M/yr
Localized incident requiring PR/amnestic response, small repairs, or modest medical/amnestic costs (no large structural damage).
small public sighting
single-person contact event
limited property/vehicle loss
🚨
Major Incident
$1.6M/yr
Significant containment event with property damage, larger legal/compensation costs, extended emergency response and investigative audits.
growth event in non-designed area
multiple civilian exposures
substantial property damage
🚨
Catastrophic Breach
$4.6M/yr
Worst-case year requiring relocation to a remote compound or indefinite sequestering, incurring capital relocation costs plus elevated operating expenses.
repeated containment failures
unmanageable public hazard
decision to relocate/sequester
Personnel
13 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] Six guards covering three 8-hour shifts (two per shift). Salaries included in staff_wages. |
| Security Supervisor | 1 | [#3] On-site supervisor overseeing guard teams; salary included in staff_wages. |
| Research Scientist | 3 | [#9] Laboratory researchers (2–4 typical; budgeted personnel cost covers these roles). |
| Principal Investigator | 1 | [#9] PI overseeing research program; personnel cost included in research personnel budget. |
| Emergency Response Team (on-call) | 2 | [#8] On-call rapid-response personnel; costs modeled in staff_wages/on-call budget. |
Confidence Notes
Line-item recurring costs (wages, facility maintenance, research consumables) are well-specified, but large contingency items (technetium procurement, relocation capital, severity/frequency of public incidents) are highly uncertain, so overall confidence is medium.