SCP-3052
Euclid
~
medium confidence
SCP-3052
Expected annual
$1.2M
One-time setup
$915K
Annual recurring
$1.2M
Personnel
10.25
Initial setup costs are dominated by secure containment chamber and secure media infrastructure; recurring costs are driven by 24/7 monitoring staff, security, and specialized psychological/memetic support. First-year (one-time + one year operations) is estimated at roughly $2.13M (one-time $915k + recurring $1.215M), with steady-state annual costs ~ $1.215M.
One-Time Capital Costs
Total: $915K
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal year with no major incidents; steady-state operations and scheduled research.
normal monitoring and research
no unauthorized recordings
scheduled maintenance and training
🚨
Minor Incident
$1.4M/yr
Limited containment incident (unauthorized recording leak or small breach) requiring incident response, extra counselling, and modest legal/PR actions.
unauthorized photograph leaked internally
localized psychological distress among staff
small-scale containment breach requiring short lockdown
🚨
Major Breach
$3.2M/yr
Significant breach or public exposure (media leak of contaminated recordings) requiring full recovery operations, legal settlements, major PR response, and potential relocation/upgrades.
public dissemination of SCP-3052-2 media
large-scale psychological contagion or memetic incidents
forced public/legal response and facility remediation
Personnel
10.25 total
| Role | Count | Notes |
|---|---|---|
| Level-2 Technician / Monitor | 6 | 24/7 monitoring staff coverage, redundancy and relief shifts (mapped to #6). |
| Security Officer / MTF Agent | 3 | Wing entrance guards, device-check stations, access control (mapped to #8). |
| Memetics Researcher | 1 | Specialized memetic/cognitive research staffing for SCP-3052-2 content analysis (mapped to #21). |
| On-site Psychologist | 0.25 | Part-time psychologist providing weekly sessions and counseling availability (mapped to #7 and #10). |
Confidence Notes
Analyst notes provide detailed line-item ranges for nearly every cost element, enabling a mid-confidence estimate; however, large ranges on many items (construction, legal, contingency) and the anomalous/memetic uncertainty reduce confidence to medium.