SCP-3053
Unknown
~
medium confidence
SCP-3053
Expected annual
$1.2M
One-time setup
$1.0M
Annual recurring
$1.2M
Personnel
9.41
Estimated one-time setup costs are approximately $1.00M, with ongoing annual operations around $1.20M driven primarily by staff wages, logistics (vehicles/medevac/transport), monitoring systems, and a 30% contingency reserve.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $1.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.2M/yr
Normal operational year with routine monitoring, scheduled maintenance, and no major incidents.
routine_maintenance
scheduled_research
no_incidents
🚨
Minor Incident
$1.3M/yr
Localized incident (medical evacuation, limited structural damage, or targeted remediation) requiring short-term surge spending.
medevac_use
small_structural_repair
targeted_remediation
🚨
Major Breach
$1.7M/yr
Significant containment breach or escalation requiring emergency response, large repairs/replacement, and extensive remediation.
containment_breach
casualties
extensive_equipment_replacement
🚨
Research Scale Up
$2.2M/yr
Opportunity or need to rapidly scale research (construction of permanent facility, expanded R&D, repeated large expeditions).
research_breakthrough
facility_scale_up
multiple_helicopter_expeditions
Personnel
9.41 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#1] Eight FTE game-warden style guards to provide 24/7 coverage (3 shifts × 2 people + leave). |
| Field Supervisor / Containment Lead | 0.25 | [#2] 0.25 FTE portion of a mid/senior staffer assigned to coordinate interventions and interface with command. |
| Research Scientist | 0.83 | [#20] Research salary allocation (~$100k/yr assumed, ~0.83 FTE at a $120k nominal full-time rate). |
| Medical Officer / Paramedic | 0.33 | [#13] Part-time medic stipend included (~$40k/yr; ~0.33 FTE equivalent). |
Confidence Notes
Analyst notes provide detailed line items and ranges, but many costs (amnestic usage, medevac per-use, local cover payments, and escalation) are highly variable; figures are mid-range order-of-magnitude estimates, not procurement quotes.