SCP-310
Safe
~
medium confidence
SCP-310
Expected annual
$648K
One-time setup
$2.4M
Annual recurring
$632K
Personnel
6
Upfront capital costs are dominated by specialized containment construction, controlled-burn infrastructure, redundant remote-handling and large incident reserves (total one-time ~$2.19M). Recurring annual costs (~$632k/yr) are driven primarily by personnel, insurance/medical readiness, utilities and ongoing maintenance.
One-Time Capital Costs
Total: $2.4M
Annual Recurring Costs
Total: $632K/yr
Cost Scenarios
📊
Baseline
(baseline)
$632K/yr
Routine operational year with no major incidents; ongoing maintenance, staff wages, insurance and compliance costs only.
normal operations
scheduled testing
no containment breaches
🚨
Minor Incident
$752K/yr
Containment event causing localized damage or a non-catastrophic staff injury requiring medical evacuation, overtime, repairs and incident investigation.
small containment breach
single severe injury or medevac
localized equipment damage
🚨
Major Breach
$1.4M/yr
Significant containment failure causing major facility damage, multiple serious injuries, extended downtime and large repair/replacement and legal costs.
facility fire spread beyond containment
multiple severe injuries
structural damage requiring rebuild
🚨
Political Exposure
$932K/yr
Public exposure or leak requiring extensive legal, PR, and cover operations and possibly additional containment expenditures.
information leak
media/legal action
forced public remediation
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Senior Scientist | 1 | [#9] Lead researcher/oversight (salary included in staff_wages). |
| Research Technician | 2 | [#9] Laboratory technicians for day-to-day testing and maintenance (salaries included). |
| Security Officer / MTF Agent | 2 | [#9] Dedicated security staff/escorts for containment and transport. |
| EHS / Safety Specialist | 1 | [#9] Part-time or pro-rated safety specialist (counted as 1 FTE-equivalent for staffing costs). |
Confidence Notes
Line-item cost ranges were provided for most items, allowing mid-point estimates; however significant uncertainty remains around incident reserves, probability of adverse events, and choices about reserve sizing and rebuild costs, so confidence is medium.