SCP-311
Safe
~
medium confidence
SCP-311
Expected annual
$1.5M
One-time setup
$1.1M
Annual recurring
$1.4M
Personnel
15
Initial one-time setup and contingency reserves total $1,125,000, driven mostly by a secure vault build and a sizable incident contingency reserve. Recurring annual costs are estimated at $1,441,500/year, driven primarily by staff wages (security, oversight, and research), D-class program costs, and contracted medical coverage.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal year with standard experiments, no major incidents; all recurring controls and programs operate as budgeted.
routine_testing
no incidents
regular maintenance
🚨
Minor Incident
$1.5M/yr
Limited accidental transfer or experiment mishap resulting in localized civilian injury or a small containment response.
experimental mishap
localized civilian harm
small remediation/cover effort
🚨
Major Breach
$2.4M/yr
Significant misuse or exposure requiring large-scale remediation, extended medical/legal response, and use of contingency reserve.
widespread civilian exposure
containment policy failure
high-profile legal action
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#5] 24/7 guard coverage for Sector-28 access control; 3–4 guards estimated to cover shifts. |
| Research Scientist | 3 | [#10] Researchers to design and oversee experiments and analysis (team of 2–4; midpoint used). |
| Lab Technician / Research Assistant | 2 | [#8, #10] Technical staff for instrumentation, data acquisition and experiment execution. |
| Senior Staff / Approving Authority | 2 | [#6] Level-4+ senior staff time allocated for authorizations and periodic reviews. |
| Medical Officer | 2 | [#7] On-call ER physician and nurse coverage for experimental sessions (contracted coverage reflected in recurring costs). |
| Administrative Staff / Records & IRB | 1 | [#16, #23] Administrative support for secure records management, IRB/O5 review preparation and audit logs. |
| Engineer / Maintenance | 1 | [#24] Facility engineer/maintenance support allocated proportionally for Vault and Sector-28 systems. |
Confidence Notes
Estimates are midpoint syntheses of wide bands provided in analyst notes and the SCP text. Technical infrastructure and personnel costs are well-scoped, but incident probabilities and contingency usage are uncertain, producing moderate confidence.