SCP-3108
Safe
~
medium confidence
SCP-3108
Expected annual
$734K
One-time setup
$1.4M
Annual recurring
$720K
Personnel
8
One-time capital and contingency costs are dominant (~$1.436M) for a reinforced test chamber, ventilation, and a large contingency/rescue fund; recurring annual costs are substantial (~$720k/yr) driven mainly by security salaries, research oversight, and administrative overhead.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $720K/yr
Cost Scenarios
📊
Baseline
(baseline)
$720K/yr
Normal year with no containment incidents; regular testing and operations continue.
routine_testing
no_incidents
🚨
Minor Incident
$770K/yr
Small containment incident or equipment failure requiring modest repairs, overtime, and extra forensics.
local_structural_damage
minor_contamination
additional_forensic_analysis
🚨
Major Breach
$1.7M/yr
Significant structural damage or heavy-lift recovery required (cranes, contractors), potential large-scale remediation.
floor_or_wall_collapse
large_mass_change
heavy_lift_recovery
🚨
Loss Of Artifact
$920K/yr
SCP-3108-1 is lost/destroyed, triggering exhaustive recovery and special operations.
loss_of_scp_3108_1
external_recovery_operations
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4] Four guards assigned in rotation for 24/7 coverage; salaries & benefits reflected in staff_wages. |
| Research Scientist | 2 | [#6] Two named senior researchers (pro‑rata salary allocation included in staff_wages). |
| Security Supervisor / On-call | 1 | [#5] Supervisor on-call for tests; per-test staffing/overtime budget included in staff_wages. |
| Administrative Staff | 1 | [#24] Site administrative/procurement support covered by administrative overhead allocation. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most categories (security salaries, chamber, contingency), but several items (contingency sizing, incident probabilities, optional robotics) are judgment calls; mapping of some costs between facility/equipment categories required assumptions.