SCP-3112
Safe
~
medium confidence
SCP-3112
Expected annual
$30.5M
One-time setup
$260.9M
Annual recurring
$30.3M
Personnel
42
One-time capital costs are dominated by a dedicated satellite constellation and associated ground/operations infrastructure (~$260.9M one-time). Annual operating costs are dominated by equipment maintenance (satellite/ground systems) and staff wages (~$30.3M/yr).
One-Time Capital Costs
Total: $260.9M
Annual Recurring Costs
Total: $30.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$30.3M/yr
Normal year with routine monitoring, no major incidents; recurring maintenance and staffing as budgeted.
routine operations
scheduled maintenance
regular testing
🚨
Minor Incident
$30.7M/yr
Localized influx of SCP-3112-A at Site-81 or a small number of external sites requiring overtime, temporary storage and extra testing.
sudden influx at Site-81
multiple small field deployments
🚨
Major Breach
$35.3M/yr
Significant equipment failure (satellite loss or major ground-station failure) or larger operational breach requiring emergency replacement, launch or major repairs.
satellite failure
major ground-station outage
🚨
Goi Contact Escalation
$32.8M/yr
Negotiations or escalatory interactions with GOI-312 requiring expanded PR/psych operations, legal action, rapid field responses and contingency spending.
GOI-312 direct contact
negotiation or retaliation events
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Satellite Operations / Remote Sensing Analysts | 15 | [#3] 24/7 ops staff to monitor EM data, task assets and maintain satellite health. |
| Site-81 Security / Custodial / Tech | 6 | [#4] Continuous monitoring of Site-81 break room to collect SCP-3112-A manifestations (3 shifts × 2 personnel). |
| Field Operatives / Mobile Response | 6 | [#13] Mobile teams to investigate external locations flagged by satellites; rotation to cover deployments. |
| Research Scientist | 4 | [#8, #10] Site-79 testing staff and lead researchers for forensic/testing programs. |
| Linguistics / Cryptanalyst | 3 | [#9] Specialists/contractors to analyze unknown scripts and languages appearing on SCP-3112-A. |
| Engineer / Maintenance | 4 | [#11, #22] RF engineers and maintenance staff for satellites, ground stations and lab equipment. |
| Administrative Staff | 2 | [#25] Program management, inter-site coordination and administrative overhead. |
| Couriers / Secure Transport | 2 | [#17] Trained couriers for inter-site transfers and chain-of-custody. |
Confidence Notes
Mid confidence: analyst notes cover most line items, but satellite procurement, insurance and long-term maintenance rates have wide uncertainty and materially affect totals; field activity levels and GOI interactions are also uncertain.